Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 25, 2026 at 8:00 PM
Updated October 2, 2026
Demolition and site work for a municipal facility in Elk Grove Village, Illinois. Completed plans call for the demolition of a 18,000-square-foot, four-story above grade municipal facility; and for site work for a municipal facility.
Demolition and site restoration including removal of structures, trees, shrubs, stumps, and pavement; sewer and water system infrastructure modification; utility abandonment; structural fill placement and compaction; grading; landscaping restoration. These types of projects shall include work equivalent or larger in scope, size, and complexity to the following: the complete demolition, disposal , and backfilling of a four-story commercial or institutional structure with a minimum 18,000-square-foot footprint; selective pavement cutting and removal; concrete drainage structure modifications including coring and PVC storm sewer construction; utility abandonment of pipe networks ranging from 4-inch to 30-inch in diameter using pumped flowable fill; complete water service disconnection from an active 12-inch asbestos-cement pipe (ACP); installation of 12- inch ductile iron pipe ( DIP) watermain including connections to existing ACP; structural backfill compaction and QA/QC testing; mass earthwork balancing and contractorproposed alternative grading strategies to optimize cut/fill volumes; construction staking and grading control ; importing, spreading, and fine grading topsoil; and comprehensive site restoration to establish a healthy, park-like lawn with positive drainage. Work must have included all incidental and collateral work necessary to deliver a fully stabilized site ready for future development within Village limits as shown on Plans and as described in Specifications and Contract Documents CD-2627- 01. For questions concerning the Project please contact Erik Schultz in the Community Development Department at 847-357-4238
Sub-Bidding
$900,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2026
December 3, 2026
1000 Busse Rd, Elk Grove Village, IL
Related To This Project
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Oct 09 2026
Elk Grove Village, IL
Bid Date: Oct 12 2026
Elk Grove Village, IL
Bid Date: Oct 16 2026
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Oct 22 2026
Elk Grove Village, IL
Bid Date: Sep 29 2026
Elk Grove Village, IL
Bid Date: Sep 29 2026
Elk Grove Village, IL
Bid Date: Sep 16 2026
Elk Grove Village, IL
Bid Date: Sep 06 2021
Elk Grove Village, IL
Bid Date: Aug 18 2026
Elk Grove Village, IL
Bid Date: Aug 27 2026
Elk Grove Village, IL
Bid Date: Sep 03 2026
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Jul 22 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed