Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 30, 2026 at 8:00 PM
Updated October 6, 2026
Demolition, site work, paving and new construction of a civil project in Central Township, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for the demolition of a bridge / tunnel.
The Scope of Work includes removal of the bridge (3 large corrugated steel culvert pipes) on Schuchart Road over Birch Creek and provides for excavations, pile driving, bridge construction, embankments, asphalt paving, pavement striping, guard rail, traffic control, erosion control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Franklin County anticipates issuing notice to proceed sometime between January and March of 2027. Any questions regarding this project must be submitted to: mspalding@cochraneng.com, by 4:00 pm local time on October 22, 2026. No written questions after this date or any verbal questions will be recognized. For a contractor to be awarded this project the contractor must have a fully responsive contractor questionnaire on file with the Missouri Highway and Transportation Commission at least 7 days prior to the bid opening date. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the current Missouri Standard Specifications for Highway Construction. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. The Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modots Consent. MODOT - Schuchart Road Bridge Construction estimate $700,000- $800,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
$800,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2026
December 28, 2026
Schuchart Rd, Central Township, MO
Related To This Project
Central Township, MO
--
Central Township, MO
Bid Date: Jan 16 2026
Affton, MO
Bid Date: Oct 13 2026
Kirksville, MO
Bid Date: Oct 08 2026
Jamestown, MO
Bid Date: Oct 05 2026
Liberty, MO
Bid Date: Oct 15 2026
Tracy, MO
Bid Date: Oct 20 2026
Sturgeon, MO
Bid Date: Oct 09 2026
Wildwood, MO
Bid Date: Oct 06 2026
Columbia, MO
Bid Date: Oct 09 2026
Kansas City, MO
--
Nevada, MO
Bid Date: Sep 24 2026
Potosi, MO
Bid Date: Oct 13 2026
Florissant, MO
Bid Date: Oct 08 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed