Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Site work and paving for a sidewalk / parking lot in Oregon City, Oregon. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk replacement project at the Red Soils campus. Question Deadline - 10/07/2026 Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us If any Bidder contemplating submitting a Bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications or forms of contract documents, or detects discrepancies or omissions, such Bidder may submit to the Architect (read "Engineer" throughout in lieu of Architect as appropriate) a written request for an interpretation thereof at least ten (10) calendar days prior to the date set for the Bid Closing. The contractor shall supply all vehicles, labor, tools and other equipment, services and supervision required to complete the work as per plans, specifications, and direction. Work includes but is not limited to: Saw cut and demolition of existing sidewalks and pavers, clearing and grubbing of tree roots and shrubbery, grading and compaction of subgrade, forming, rebar installation, concrete placement with general broom and stamped finishing. There is no specific order of operations between the sidewalks and stamped slabwork; the work may be completed concurrently or consecutively. General Requirement: 1. The Subcontractor shall be responsible for supplying and installing all required materials and labor as per this specification. Supply shop drawings or technical specifications for approval, if required, before starting any installation or fabrication. No changes will be made unless authorized and approved in advance by the County. Work will be completed in accordance with a schedule approved in advance by the County. Any materials paid for by the County and not incorporated into the project shall become the property of the County and remain at the project site. 2. Access to parking lots, building entrances and adjacent pathways shall be kept open whenever possible. Contractor shall provide signed sidewalk closures with detours when applicable. 3. Traffic control and applicable permits to allow equipment access to the work site from ROW shall be the responsibility of the subcontractor. Care and diligence must be used to avoid any damage to the existing facility. Any damage incurred through the Subcontractors operations will be the sole responsibility of the Subcontractor. A staging area at the work site will be provided. The staging area, work site and all areas impacted or used by the Subcontractor shall be clean and clear of construction materials on a daily basis at the end of the work shift. All debris and waste shall be removed from the facility and disposed of properly at the completion of the project. 5. Clackamas County will provide potable water and 120v power supply at specific locations for Contractor's operations. Any additional requirements or needs of the subcontract shall be included in the bid proposal.

GC Bidding

$125,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
77
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 23, 2026

Project location map

Multiple Locations, Oregon City, OR

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed