Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 16, 2026 at 8:00 PM
Updated October 22, 2026
Site work for a water / sewer project in Thornton, Colorado. Completed plans call for site work for a water / sewer project.
A. The Work is located in Larimer and Weld Counties, and extends from Larimer County Road 54, west of I-25 to Weld County Road 88, east of Larmier County Road 1. B. Work to be performed under this Contract includes, but is not limited to, constructing a welded steel raw water pipeline 42 inches diameter. Included, but not limited to, are associated appurtenances, including air vacuum and air release valves, blow-off valves, drain valves, manways, temporary pipe bulkheads, a corrosion protection system, provisions for pressure testing and connecting to other segments, and fiber optic (FO) conduit with pull boxes. It also includes a pressure gauge and transmitter, including any required power supply and communications panel that will interface with the fiber optic communications system and all other Work required in accordance with the Contract Documents. C. Contracting Method: The Project will be constructed under a single prime construction Contract. Project will be contracted with Segment F.2 in a single contract, but Segment F.1 will be executed under separate Contract Documents by Others. Contractor is responsible for coordination of requirements at interface between F.1 and F.2. D. Hazardous Environmental Conditions: 1. To the best of Owner's knowledge, information , and belief, the prior use of the Site included agriculture, irrigation, ROW, and open space. Question Deadline 10/05/2026 Every request for such interpretation shall be in writing addressed to Patrick Hinterberger, Contracts Supervisor, 9500 Civic Center Drive, Thornton, CO 80229-4326, or e-mail Patrick.hinterberger@Thornton CO.gov, and to be given consideration it must be received by 5:00 p.m., on the tenth (10th) Calendar Day prior to the date fixed for the submission of Bid Proposals. This Project includes construction of Segments F.1 and F.2 of the Thornton Water Project. This Segment includes approximately 10 miles of fully welded 42 steel raw waterline installation to connect previously constructed segments to the source pump station through Larimer County. The project includes tunneled installation as well as open cut installation and associated facilities.
Post-Bid
$500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2026
November 16, 2026
Multiple Locations, Thornton, CO
Related To This Project
Thornton, CO
--
Thornton, CO
Bid Date: Nov 06 2026
Thornton, CO
--
Thornton, CO
Bid Date: Oct 08 2026
Thornton, CO
--
Thornton, CO
Bid Date: Oct 21 2026
Thornton, CO
Bid Date: Oct 20 2026
Thornton, CO
Bid Date: Oct 21 2026
Thornton, CO
Bid Date: Oct 08 2026
Thornton, CO
Bid Date: Sep 25 2026
Thornton, CO
Bid Date: Oct 02 2026
Thornton, CO
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed