Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2026 at 8:00 PM

Updated October 1, 2026

Site work for a water / sewer project in Findlay, Ohio. Completed plans call for site work for a water / sewer project.

This project consists of removing an existing 12" water line and a 15" sanitary line out of the existing 36" storm sewer. To remove the existing 12" water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15" out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18" sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18" sanitary sewer to be attached to the existing pipe that is to southeast. The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer. Prospective bidders may address inquiries to Logan Schalk through the online website. All inquiries must be submitted no later than 11:00 a.m. October 5, 2026

GC Bidding

$185,320.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
143
Bidding Soon
1,855
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

November 9, 2026

Project location map

Multiple Locations, Findlay, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed