Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 29, 2026 at 8:00 PM
Updated October 5, 2026
Site work and new construction of a mixed-use development in Cooperstown, North Dakota. Completed plans call for the construction of a 900-square-foot swimming pool; playground / park / athletic field; for site work for a playground / park / athletic field; and swimming pool.
Builder to supply wet stamped blueprints for construction of the pool and splash pad criteria outlined below. Target pool opening date - June, 1st, 202 any questions can be directed to Chris Olson. Construction of a 5,200 square foot zero entry L-shaped swimming pool with a 20 ft x 20 ft 9ft-deep section, and a 30-foot x 30-foot recirculating splash pad, including miscellaneous construction items. Builder to supply wet stamped blueprints for the following pool and splash pad Pool size: L shaped with zero entry 40 foot wide with zero entry and tanning ledge and pool is 120 feet long with a 20 x 20 L shaped that is 9 feet deep. Pool will be 6 feet wide at the widest part of the pool. Construction materials for the pool will include the following. Concrete to code approximately 8 inches thick on deep end pool walls with footing under the concrete wall section. Pool will have 2-foot radius on corners and steel wall panels on top of concrete 48 inches in height with a 5-inch flange. Pool floor deep end 9 feet to slope will be 8-inch concrete with proper rebar and zero entry portion of the pool will be poured concrete including the tanning area. Remaining pool floor will be Pool Crete hand troweled and finished. Safety grip coping stones around pool 2 feet in width. Pool depth on long end is 5 feet with dual water slide entering that location and 22 feet of transition marking is needed. Proper markings for pools in all areas. Pool is to be completed with RenoSys PVC membrane on walls and floor. 60ML hot air welded. Plumbing requirements. General detail to be added to engineered blueprints. 2 24inch SS main drains bonded to grid with VGB paperwork connected to a 6-inch feed line. Skimmers for every 400 square feet and not more than 2 skimmers per line. 21/2" plumbing 1085 skimmers Returns not more than 3 connected to a line. Starting 5 feet off each corner and not exceeding 20 feet apart. 2" plumbing Floor skimmer 12 feet long on zero entry 2" inch plumbing Floor returns on zero entry Suction line and return line are to be 6-inch 2 1/2 inch line run for future water slide Equipment room header to be sized from 6 inch to 3",2 1/2 ", and 2" plumbing to match all equipment. Mega Mesh winter safety cover for the entire pool with 3-foot straps One 10HP EQ pump with Stainer Three 620XF Cartridge filters with extra set of filters for each filter. 3" inlet with 180GPM flow rating. with Stenner pumps. Liquid Chlorine and acid One Drive system for VS pump for 10HP pump Four 140K Pentair Heat Pumps Chemical control system UV for 25% pool flow rating with controlled flow not to exceed 30mljl All white goods including all valves, gauges, auto fill, and anything needed for the closed system. All depth markers Pressure testing of all lines Start up and training of pool including OM manual Splash Pad criteria: 30 x 30-foot recirculation pad with a 8-foot walkway around all sides of the Splash Pad. Pad will have main features. 3 Dumping buckets Toad Twister Jelly Stick Medium Jelly Stick Curved Rain Stick
GC Bidding
$310,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2026
November 12, 2026
15th St and Rollin Ave, Cooperstown, ND
Related To This Project
Cooperstown, ND
Bid Date: Jun 12 2026
Cooperstown, ND
Bid Date: Nov 21 2025
Cooperstown, ND
Bid Date: Jun 03 2025
Cooperstown, ND
--
Cooperstown, ND
Bid Date: Apr 18 2025
Cooperstown, ND
Bid Date: Apr 03 2025
Cooperstown, ND
--
Cooperstown, ND
Bid Date: Mar 19 2021
Cooperstown, ND
Bid Date: Nov 17 2023
Cooperstown, ND
Bid Date: Mar 11 2022
Cooperstown, ND
Bid Date: Mar 03 2023
Belcourt, ND
Bid Date: Oct 09 2026
Williston, ND
--
Grand Forks, ND
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed