Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Site work and new construction of a laboratory facility in Cleveland, Ohio. Completed plans call for the construction of a laboratory facility.

Construction of government-owned government-operated R&D facility for aerospace power systems. The purpose of this contract is to acquire an Aerospace Power Systems Laboratory (APSL) and related services at Glenn Research Center (GRC), Cleveland, Ohio . The contractor will provide a two-phase Design-Build of a new laboratory facility to support the testing and development of power systems with associated site work, infrastructure, and systems. The scope of work includes the design , procurement, and installation at GRC. Scope of Work: _ The Scope of Work for this project includes the design and construction of an Aerospace Power Systems Laboratory (APSL) facility at the NASA Glenn Research Center (GRC), Lewis Field, Cleveland, Ohio. The APSL facility is envisioned as an approximately 34,000 Square Feet structure with associated site work. The APSL facility will consolidate and modernize research, development, and testing functions associated with aerospace power systems in a single, integrated facility to support NASA's current and evolving mission objectives . It is envisioned that the new building will be outfitted with special testing equipment such as vacuum chambers and specialized lab equipment to support advanced space power systems research and testing; this design and construction effort must allow for integration of this Government Furnished Equipment. Power, energy storage, energy conversion, and distribution are core competencies of NASA GRC.APSL will provide modern test facilities to advance power research and enable NASA to meet current and future mission needs. _ The facility is intended to accommodate a mix of administrative spaces, laboratories, high-bay test areas, performance testing and evaluation spaces, operational support areas, facility support spaces, and personnel amenities. The facility layout must promote efficient workflows, safe movement of personnel and equipment, and functional adjacencies that support testing operations and research collaboration. A central high-bay test area is anticipated as a primary organizing element of the facility, with associated laboratories and support functions arranged to provide safe, efficient access and material handling. _ The APSL facility must support advanced and potentially hazardous test operations. Accordingly, the facility design must address requirements for high-capacity electrical power, specialized mechanical systems, cryogenic fluid storage and distribution, cooling towers, and specialty life safety systems, as applicable. Offerors must evaluate and propose appropriate strategies for managing hazardous operations, including the potential use of physically separated structures or segregated areas to isolate hazards, enhance safety, and maintain operational continuity. _ Additional information and detailed requirements will be provided during Phase Two of the two-phase design-build solicitation process.

GC Bidding

$30,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
145
Bidding Soon
2,480
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2026

November 18, 2026

Project location map

Multiple Locations, Cleveland, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed