Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 15, 2026 at 8:00 PM

Updated October 26, 2026

Site work and renovation of a bridge / tunnel in Charleston, South Carolina. Completed plans call for the renovation of a bridge / tunnel.

DESCRIPTION OF PROJECT: Debris to be removed from all storm drains. Storm drains shall be cleaned, rust removed for paint prep, and two coats of epoxy shall be applied at drain basins. Missing storm drain grates to be replaced . Wooden top handrail to be hand-cleaned and sanded . Approved penetrating oil sealer to be applied to wooden top handrail . Waterjet bridge deck and sidewalk to remove graffiti. Pressure wash barriers and metal guardrail . Guardrail to be hand-cleaned to prepare for new coatings. Prime coat of 100% solids epoxy primer to be applied to metal guard rail, followed by a finish coat of an approved coating system for an exterior railing application (i.e. Kynar). Masonry primer and anti-graffiti topcoat to be applied to jersey barriers. Bridge to be re-striped with a thermoplastic, typical traffic rated striping paint. One white line on each side, and a double yellow at centerline. No oral interpretation of the meaning of the plans, specifications or other pre-bid documents will be made. Requests for clarification should be made in writing to the A/E or Project Manager identified in the Invitation for Construction Bids and to be given consideration must be received at least ten (10) days prior to the date fixed for the opening of bids. The last day for questions will now be Thursday, October 15, 2026 at 4:00pm. Questions must be submitted in writing to the Project Manager.

Post-Bid

$450,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
48
Bidding Soon
848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 16, 2026

Project location map

Petty St & Heriot St, Charleston, SC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed