Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Site work and renovation of an educational facility in Cameron, Texas. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Contact Kyle Deal , Operations Director at Cameron ISD, with any questions. Repair of existing siding at Ben Milam Elementary. 2.2 Removal/Preparation - Remove existing cultured stone (split face CMU) at northeast building addition at Ben Milam School - South side between buildings, Southwest side, and South side of connection breezeway only (all other cultured stone to remain). - remove stone, metal lath, and mud base at cultured stone removal areas only. Existing roof flashings/edging to remain (as possible). Remove damaged/rotten exterior plywood sheathing only (at cultured stone removal areas only). All other sub-structure to remain (as possible). -All electrical removal by Owner/Others (as necessary). All Owner's effects to be removed and reset by Owner (as necessary). - Legally dispose of all removed materials in accordance with local, state, and federal regulations. 2.3 Installation - Furnish and install new 7/16" OSB plywood sheathing at damaged/rotten removal areas only. Furnish and install Tyvek house wrap at cultured stone removal areas only. Furnish and install EIFS stucco/siding (Exterior Insulation and Finish System) at all cultured stone removal areas only. Includes EPS insulation board (thickness TBD) with exterior finish system (colors selected by Owner). Include all necessary flashings, trims, etc. 2.4 Site Protection and Safety - Maintain a secure work area. - All Contractor and subcontractor personnel accessing school grounds must comply with District background check requirements under Texas Education Code Chapter 22, Subchapter C, and must wear visible identification badges at all times. - Coordinate all material staging, dumpster placement, and crane/lift operations with the District's Facilities Department to avoid conflicts with school traffic, parking, and pedestrian pathways. - No work shall occur during school hours involving excessive noise, odor, or safety hazards without prior approval from the District. 2.5 Warranty and Closeout - Submit closeout documents including as-built drawings, warranty documentation, manufacturer inspection/certification letter, operation and maintenance manuals, and final lien waivers. Perform a final walkthrough with District representative and manufacturer's technical representative prior to final acceptance.

Sub-Bidding

$330,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
113
Bidding Soon
2,651
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2026

November 9, 2026

Project location map

2100 21st, Cameron, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed