Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated November 2, 2026

Renovation of a mixed-use development in Wyoming, Michigan. Completed plans call for the renovation of a playground / park / athletic field; and development.

The City of Wyoming is requesting bid proposals for the replacement of the irrigation systems for three ballfields at Lemery Park, located at 4050 Byron Center SW, Wyoming, MI 49509. The project includes installation of new automatic underground sprinkler systems. Note: The hydraulic systems on the two smaller fields will be removed and replaced with a system identical to the large field, utilizing a single controller two (2) wire system for all three fields. See attached diagram. A lump sum bid price must be submitted for performing the work specified in the specifications as a turnkey project. If any items, accessories, or groups of items required to perform the work are not specifically indicated in the plans and specifications, it will be the successful bidders’ responsibility to furnish those items, accessories, or groups of items, and include them in the lump sum bid price submitted. The contractor shall obtain, at its own expense, all necessary permits, inspections, testing, and any associated fees required for the project.

Post-Bid

$350,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
117
Bidding Soon
1,286
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2026

November 27, 2026

Project location map

4050 Byron Center Ave SW, Wyoming, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed