Site work and new construction of a civil project in Spokane Valley, Washington. Completed plans call for the construction of a water / sewer project; and water / sewer project.

The project consists of construction of improvements associated with the Royal Water District Well Replacement Project . The work is divided into a Base Bid (Schedule A) and an Additive Bid (Schedule B). SCHEDULE A - BASE BID Schedule A includes all work necessary to complete the physical civil site improvements, piping utilities, and structural/architectural well house building envelope. The work includes, but is not limited to: o Mobilization and site preparation, including field verification of existing utilities and earthwork. o Construction of gabion walls, slope stabilization, and erosion control improvements. o Installation of a precast concrete utility vault. o Installation of trench safety systems as required for worker protection during excavation. Installation of 4-inch and 8-inch ductile iron water mains, including connection assemblies, combination air release/air vacuum valve, valves, fittings, and other appurtenances. Construction of the new well house, including foundation, building, structural, architectural , and related improvements. o Installation of piping and mechanical appurtenances associated with the well house and water system , including the chlorination system and associated chemical piping and appurtenances, as shown in the Contract Documents. o Site restoration and related improvements. Forty (40) calendar days will be allowed for completion of the Base Bid (Phase 1) work. SCHEDULE B - ADDITIVE BID Schedule B consists of additional work necessary to provide the permanent well pumping equipment and associated electrical , instrumentation, and other systems required to make the well operational . Schedule B is an additive bid and is not included in the Schedule A Base Bid . Schedule B work will be performed only if explicitly authorized by the Owner Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond.

Post-Bid

$300,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
10
Bidding Soon
357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed