Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 18, 2026 at 8:00 PM

Updated November 2, 2026

Site work, paving, new construction and renovation of a civil project in Apalachicola, Florida. Completed plans call for the renovation of a water / sewer project; and for the construction of a water / sewer project.

The project is funded by the Florida Department of Environmental Protection (FDEP) Resilient Florida Program (Grant No. 24SRP65). The scope of work consists of providing all labor, materials, equipment, and supervision required to address nuisance flooding and drainage issues at eight (8) project locations throughout the City (Projects 104, 105, 106, 107 , 108, 109, 110, and 24-03). Improvements include, but are not limited to: Replacement and retrofitting of underground stormwater pipe systems at multiple roadway intersections, including cured-in-place pipe lining; Installation of new stormwater inlets, manholes, piping, and a water quality treatment unit; and Construction of roadway stormwater conveyance systems, including concrete-lined and sodded swales. Location 104 - Inlets, Ditch Bottom , Type D, J Bottom , >10' , Inlet Protection System , Pipe Culvert, Optional Material, Round, 18" S/CD , Pipe Culvert, Optional Material, Round, 36" S/CD , Pipe Culvert, Optional Material, Other Shape - Elliptical/Arch, 42" S/CD Location 105 - Pipe Culvert, Optional Material, Round, 18" S/CD Floating Turbidity Barrier Staked Turbidity Barrier - Nylon Reinforced PVC Location 106 - Inlets, Ditch Bottom, Type D, <10' Mitered End Section, Optional Round, 36" Side Drain Superpave Asphaltic Concrete, Traffic B Inlets, Ditch Bottom, Type D, J Bottom, <10' Staked Turbidity Barrier - Nylon Reinforced PVC Pipe Culvert, Optional Material , Round , 36" S/CD Location 107 - Mitered End Section, Optional Round, 18" Side Drain Inlets, Ditch Bottom, Type D, <10' Pipe Culvert, Optional Material, Round, 18" S/CD Pipe Culvert, Optional Material , Round, 24" S/CD Location 109 - Mitered End Section, Optional - Elliptical/Arch, 24" CD Straight Concrete Endwalls, 30", Double, 0 Degrees, Round Pipe Culvert, Optional Material, Round, 30" S/CD Mitered End Section, Optional Round, 36" CD Staked Turbidity Barrier - Nylon Reinforced PVC Superpave Asphaltic Concrete, Traffic B Bonds: 5% Bid Bond,Performance(100%), Payment(100%) question deadline date changed from 10/13/2026 to 10/23/2026 as per Addendum 2

Post-Bid

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
34
Bidding Soon
462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2026

December 29, 2026

Project location map

Multiple Locations, Apalachicola, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed