Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 12, 2026 at 7:00 PM
Updated November 19, 2026
Site work and paving for a mixed-use development in Columbia, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project shall include the construction and installation of a 105'-0" long, 11' clear width, single span, prefabricated truss pedestrian bridge at 0-degree skew and 0% grade on concrete abutments, located on the MKT Trail, over Flat Branch Creek in Columbia, MO. The Contractor's manufacturer and installer shall have a minimum of five (5) years' experience in the fabrication of clear width, single span prefabricated truss bridge structures. Site Cleanup During Project: The contractor shall perform daily cleanup of all materials whenever the project extends beyond one (1) business day. All construction debris shall be removed by the contractor upon completion of the project. If the contractor fails to perform site cleanup as required herein, the City may undertake the cleanup and charge the contractor for all associated costs. Responsibility for Materials: The contractor assumes full responsibility and all risk of loss for materials and equipment stored on site. The contractor shall ensure that such materials and equipment are properly secured, protected from damage or theft, and maintained in a condition suitable for their intended use until the project is completed and formally accepted by the City. The contractor shall be responsible for any loss of or damage to materials and equipment for the project, including but not limited to loss or damage resulting from fire, windstorm, cyclone, tornado, flood, freezing, or any other cause. The contractor may obtain insurance to cover any loss or damage for which responsibility is assumed herein. The City will not carry insurance for such loss or damage prior to the final acceptance of the project. Contractor shall supply at a minimum: _ Warranty Information, including applicable warranty terms and coverage. Certified Welder Qualifications, including current welder certifications applicable to the work being performed. . Water and electrical power are not available at the project site. The contractor shall be responsible for providing all water, electrical power, generators, temporary utilities, and associated equipment necessary to perform the work. Scheduling of Work: All work shall be scheduled through the Park Services Manager for the City. The contractor shall provide a minimum of seventy-two (72) hours' notice when requesting to begin work. No work may commence until an official Notice to Proceed has been issued by the City. Time of Completion: The contractor shall complete all work within one hundred eighty (180) calendar days from the date of the Notice to Proceed. Completion of Work Verification: Upon completion of all work, the contractor and a designated representative of the City shall meet on site to conduct a final inspection and verify that the project has been completed in full compliance with the contract requirements. question deadline date changed from 10/09/2026 to 10/27/2026 as per Addendum 1
Bid Results
$900,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2026
November 29, 2027
M-K-T Nature/Fitness Trail (Columbia to McBaine), Columbia, MO
Related To This Project
Columbia, MO
--
Columbia, MO
Bid Date: Nov 03 2026
Columbia, MO
Bid Date: Oct 29 2026
Columbia, MO
--
Columbia, MO
--
Columbia, MO
Bid Date: Oct 27 2026
Columbia, MO
Bid Date: Oct 30 2026
Columbia, MO
--
Columbia, MO
--
Columbia, MO
--
Columbia, MO
--
Columbia, MO
Bid Date: Oct 20 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed