Published October 20, 2026 at 8:00 PM

Updated October 26, 2026

Site work and new construction of a water / sewer project in Conroe, Texas. Completed plans call for the construction of a water / sewer project.

SCOPE Summary of Work 1.2 A. This project involves constructing of a 2,000 gpm Jasper well, two (2) 0.75-million-gallon ground storage tanks, a booster station with three (3) booster pumps, valves, piping and associated appurtenances. Work also includes installation of a precast control building with chemical rooms, overhead crane and two (2) HVAC units, a 15,000-gallon hydro-pneumatic tank, a 1,250-kW standby generator, Motor Control Center, SCADA and related electrical components. Site improvements include fencing, yard piping, site grading, driveway and yard paving, site restoration and other miscellaneous works as described herein.DESCRIPTION OF WORK A. The following paragraphs describe the major components of the work to be completed under this Contract. This list shall not be construed as all-inclusive and shall not waive the Contractor's responsibility to provide all necessary components of the project, either stated or implied, in full accordance with the drawings and specifications. 1) Water Well- construct a fully functional and operational water well producing approx. 2,000 gpm from Jasper aquifer. Well construction shall include but are not limited to installing 36" conductor casing, drilling test hole, water quality zone sampling & testing; installing 24" surface casing; 18" well construction, installing permanent line-shaft turbine pump, electric motor and related items. 2) Ground Storage Tanks - construct two (2) 750,000-gallon ground storage tanks (AWWA D110 Type III) and related works. Construction plans are provided with general design guidelines. Contractor shall design, construct and commission the tanks as fully functional and operation units including foundation and all appurtenances as specified. 3) Motor Control Center (MCC) Building - construct a 45-ft x 30-ft precast concrete building with chemical rooms, wall-mounted HVAC units and overhead crane. The work also include the installation of fully functional chemical rooms for ground water disinfection treatment and corrosion control. 4) Booster Pumps & Piping - install one ( 1 ), 1,000-gpm @ 175-ft TDH booster pump and two (2) 1,500 @ 175-ft TDH pumps including 12-inch and 16-inch booster station piping, valves, appurtenances, pipe supports and related works. 5) Hydro-pneumatic Tank install a 15,000-gallon ASME hydro-pneumatic tank including concrete foundation and appurtenances and related works.6) Electrical Works - furnish and install all electrical systems and appurtenances required for a complete and operational water plant, including, but not limited to, electrical service racks, Main Disconnect, MCC, well motor VFD, booster pump VFDs, pressure control panel, PLC Enclosure, breakers, switchboards, interior and exterior lighting, junction boxes, grounding system, pressure transducers, conduits, wirings and all miscellaneous electrical components as shown on the plans as specified herein. Electrical work shall also include electrical systems for the chemical equipment, including chlorine and phosphate rooms, with all associated conduits, conductors, grounding wires, and appurtenances. Work shall also include installation of security conduits; furnishing and installation of electrical equipment pads consisting of 6" reinforced concrete including all associated incidentals. Contractor shall coordinate with the Electrical Engineer (BG&D) for Shortcircuit/Coordination Study/Arc Flash Hazard Analysis and provide necessary data and install warning labels as directed and specified under electrical specifications. A licensed master electrician will be required to obtain electrical permit and request for inspection from the City Building Department for this task. 7) SCADA System - furnish and install SCADA equipment including pressure transmitters, level controls, PLC enclosure, communications, PLC & HMI SCADA screen programing, integration, startup & commissioning. SCADA graphics interface shall be programmed to match existing interface design for similar City of Conroe water plants. 8) Emergency Generator - install a new 1,250-KW natural gas generator with an automatic transfer switch, including concrete foundation, gas service from the meter to the generator. Plumbing permit is required for gas service works and must be inspected by the City's Building Department Question Submission Deadline:October 19, 2026, 1:00pm question submitted Electronically

Post-Bid

$13,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
407
Active Projects
188
Bidding Soon
4,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

October 22, 2027

Project location map

6470 Farm to Market Rd 1484, Conroe, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed