Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 22, 2026 at 8:00 PM

Updated October 29, 2026

Site work and new construction of an educational facility in East Bridgewater, Massachusetts. Completed plans call for the construction of a 108,060-square-foot educational facility.

Construction of the Central Elementary School including masonry, ornamental metals, waterproofing, roofing, metal windows, glazing, flooring, painting, fire protection, plumbing, HVAC, and electrical work. The Central Elementary School project design calls for a new approximately 108,060 gsf elementary school serving approximately 510 students in Pre-K through Grade 2. The new school will be located on the existing Central Elementary School campus at 107 Central Street in East Bridgewater, Massachusetts. The project includes construction of a new school building, associated site improvements, athletic fields, parking, and supporting infrastructure. The construction delivery method is Construction Manager at Risk (CM at Risk) in accordance with Massachusetts General Laws Chapter 149A. Gilbane Building Company was selected as the Construction Manager and has been an instrumental partner in developing construction logistics and phasing for the project. The new Central Elementary School will be constructed while the existing school remains operational, allowing students and staff to continue occupying the current building throughout the entirety of construction. Extensive site preparation, including a preload program to address site settlement, is being completed in advance of building construction. Existing access to the school will be maintained throughout construction, with carefully coordinated traffic management, pedestrian safety measures, and phased construction activities implemented to minimize disruptions to school operations. Following completion and occupancy of the new school, the existing building will be demolished, and the remaining site improvements and athletic fields will be completed. Question Deadline 10/14/2026 at 2:00 PM ET Requests for Clarifications (RFIs) will be received through online portal.

Bid Results

$100,928,707.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
316
Bidding Soon
4,518
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

December 16, 2026

Project location map

107 Central St, East Bridgewater, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed