Site work and renovation of a communication facility in Logansport, Indiana. Completed plans call for the renovation of a communication facility; and for site work for a communication facility.

This Division pertains to the construction of Phase 3 of the 69kV Transmission Line for Logansport Utilities (LU) headquartered in Logansport, Indiana. The intent of these Specifications is to detail the Contractor's function, coordination of procedures, environmental protection measures, material requirements, assembly and erection of facilities, Owner's acceptance criteria, and any other factors considered pertinent to the cost-effective construction of the electrical facilities in accordance with RUS and the Owner's standards. Question Deadline 12/08/2026 The Bidder is responsible for advising the Owner/Engineer of any conflicting requirements or Bid Document omissions, no less than seven (7) days before the proposal submittal date. Logansport Utilities ( LU) , of Logansport, Indiana intends to re-construct Phase 3 of their 69kV Transmission Line. The project is 1 mile in length and will re-utilize existing 556.6 kcm 26/7 ACSR "Dove" conductor, 3/8" EHS OHSW, 465.4kcm 19/0 AAAC "Cairo" three-phase underbuild , and a 246.9k cm 7/0 AAAC "Alliance" neutral. Twenty-seven (27) existing structures ranging from Structure 171 to Structure 197 will be replaced with direct-embedded steel poles as a part of this project All wire tensions in the back-span of Structure 171 and ahead-span of Structure 197 shall be maintained at all times. Tangent structures will utilize TP-69 framing, running angles will utilize TS-4A or TS-4AA framing, stringing deadends will utilize TS-5S framing, and fully-terminal deadends will utilize TS-5A or TS-5AA framing. Insulators will be polymer post, with polymer suspension insulators used at running angles and deadends. Most materials will be Owner-Furnished as specifically shown in the Contract Materials to be contractor furnished are noted in drawing notes and in the contractor furnished material section below. The scope of work includes the transfer of existing 69kV and 13.8kV primary conductors, along with transformers, services and other related items. Replacing wooden transmission poles with new steel poles, replacing wood distribution poles, and transferring existing 69kV conductors, 13.2kV underbuild conductors, and associated distribution facilities. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount). If you have any questions , please call me at ( 972 ) 212-1483. Isabela Ciuffetelli, PE Project Manager Entrust Solutions Group - iciuffetelli@entrustsol.com K - 586 10/1 , 8 1989027

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
173
Bidding Soon
1,919
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2026

April 1, 2027

Project location map

Multiple Locations, Logansport, IN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed