Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 30, 2026 at 8:00 PM
Updated November 4, 2026
Site work, paving and renovation of a mixed-use development in Rohnert Park, California. Completed plans call for the renovation of a municipal facility; fire / police facility; and municipal facility.
Providing and installing electric vehicle charging stations including trenching, concrete pad installation, sidewalk repair, patch asphalt paving, striping, and installing charging stations and wiring. Bonds: 100% Payment Bond, 100% Performance Bond. Requests for Information (RFIs) by Monday, October 19, 2026 at 4:00 PM to the Department of Public Works at PWProjects@rpcity.ca.gov and/or LHolt@rpcity.ca.gov. The work is generally described as, but not limited to, providing and installing electric vehicle charging stations at three (3 ) Rohnert Park locations: City Hall (130 Avram Avenue), Public Safety Main building (500 City Center Drive), and Public Works Corporation Yard (600 Enterprise Drive). The project includes, but is not limited to, trenching, concrete pad installation, removing and repairing sidewalk, patch asphalt paving, striping, and installing charging stations and wiring. Provide Design of Two (2) Level-2 Electric Vehicle Charging Stations Rated at 208/240 Vac @ 40 Amps Each . Stations to Be Located at Existing Parking Spaces Including One Van Accessible Station (No Changes to Parking Proposed). Electric Vehicle Charging Stations Shall Be Mounted Footings As Indicated Within the Drawings. PN - 1819.0.00CY
Bid Results
$490,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2026
November 30, 2026
Multiple Locations, Rohnert Park, CA
Related To This Project
Rohnert Park, CA
Bid Date: Nov 05 2026
Rohnert Park, CA
--
Rohnert Park, CA
--
Rohnert Park, CA
--
Rohnert Park, CA
--
Rohnert Park, CA
--
Rohnert Park, CA
--
Rohnert Park, CA
Bid Date: Oct 14 2026
Rohnert Park, CA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed