Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 6, 2026 at 8:00 PM

Updated October 8, 2026

Site work and renovation of an educational facility in Lexington, South Carolina. Completed plans call for the renovation of a educational facility.

Construction Manager at Risk (CM-R) preconstruction and construction services for five existing-facility improvements. The preliminary construction planning budget is $4,875,000. Facility and Location - White Knoll High School / 5643 Platt Springs Road, Lexington, SC 29073 Defined Project and Preliminary Scope - Provide and install a new and complete Fire Alarm System in the original areas of the building, to include new cabling, devices, main panels, sub-panels, and system programming (newly installed raceways shall be utilized). The scope includes the decommissioning and demolition of the existing Secutron system following the successful activation and formal inspection of the new system. The engineering design for this project has been fully completed. Budget - $ 1,000,000 Construction Start: February 1 , 2027 Substantial Completion Date: July 23, 2027 Final Completion Date: October 1 , 2027 Facility and Location - Gilbert High School Stadium/ 840 Main Street, Gilbert, SC 29054 Defined Project and Preliminary Scope - Synthetic Turf System Removal of existing sod and topsoil, followed by the installation of a new synthetic turf system, including associated concrete work, fencing, storm drainage, infrastructure, and related accessories. Budget - $ 1,700,000 Construction Start: April 19, 2027 Substantial Completion Date: August 6, 2027 Final Completion Date: August 17, 2027 Facility and Location - White Knoll High School / 5643 Platt Springs Road, Lexington, SC 29073 Defined Project and Preliminary Scope - Gymnasium & Locker Room Roof Re-roof approximately 17,000 square feet of existing modified asphalt built-up roofing (BUR) system. Remove existing ballast stone and install approximately 30,000 square feet of an approved new lightweight concrete roofing system. Architectural/engineering design for this project is fully complete. Budget - $1,800,000 Construction Start: May 27, 2027 Substantial Completion Date: July 23, 2027 Final Completion Date: October 1 , 2027 Facility and Location - White Knoll Elementary School / 132 White Knoll Way, West Columbia, SC 29170 Defined Project and Preliminary Scope - Retention Pond Remediation & Infrastructure Improvements: Excavate the pond basin , reshape the dam embankment, and construct a new outfall structure. Scope of work encompasses all grading, turf establishment, ground stabilization, and comprehensive erosion and sediment control measures, to be designed by a Civil Engineer. Budget - $250,000 Construction Start: February 1 , 2027 Substantial Completion Date: May 3, 2027 Final Completion Date: October 1 , 2027 Facility and Location - Lexington High School / 2463 Augusta Highway, Lexington, SC 29072 Defined Project and Preliminary Scope - Elevator Modernization Modernization of one (1) elevator, including all mandatory Chapter 1 and SC-LLR inspections, accompanied by a one-year warranty. Budget - $ 125,000 Construction Start: May 27, 2027 Substantial/Final Completion Date: July 23, 2027 Question Deadline 10/07/2026 at 10:00 AM ET Questions must be received electronically.

GC Bidding

$4,875,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
145
Bidding Soon
1,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

February 1, 2027

Project location map

Multiple Locations, Lexington, SC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed