Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 6, 2026 at 8:00 PM
Updated October 8, 2026
Site work and renovation of an educational facility in Lexington, South Carolina. Completed plans call for the renovation of a educational facility.
Construction Manager at Risk (CM-R) preconstruction and construction services for five existing-facility improvements. The preliminary construction planning budget is $4,875,000. Facility and Location - White Knoll High School / 5643 Platt Springs Road, Lexington, SC 29073 Defined Project and Preliminary Scope - Provide and install a new and complete Fire Alarm System in the original areas of the building, to include new cabling, devices, main panels, sub-panels, and system programming (newly installed raceways shall be utilized). The scope includes the decommissioning and demolition of the existing Secutron system following the successful activation and formal inspection of the new system. The engineering design for this project has been fully completed. Budget - $ 1,000,000 Construction Start: February 1 , 2027 Substantial Completion Date: July 23, 2027 Final Completion Date: October 1 , 2027 Facility and Location - Gilbert High School Stadium/ 840 Main Street, Gilbert, SC 29054 Defined Project and Preliminary Scope - Synthetic Turf System Removal of existing sod and topsoil, followed by the installation of a new synthetic turf system, including associated concrete work, fencing, storm drainage, infrastructure, and related accessories. Budget - $ 1,700,000 Construction Start: April 19, 2027 Substantial Completion Date: August 6, 2027 Final Completion Date: August 17, 2027 Facility and Location - White Knoll High School / 5643 Platt Springs Road, Lexington, SC 29073 Defined Project and Preliminary Scope - Gymnasium & Locker Room Roof Re-roof approximately 17,000 square feet of existing modified asphalt built-up roofing (BUR) system. Remove existing ballast stone and install approximately 30,000 square feet of an approved new lightweight concrete roofing system. Architectural/engineering design for this project is fully complete. Budget - $1,800,000 Construction Start: May 27, 2027 Substantial Completion Date: July 23, 2027 Final Completion Date: October 1 , 2027 Facility and Location - White Knoll Elementary School / 132 White Knoll Way, West Columbia, SC 29170 Defined Project and Preliminary Scope - Retention Pond Remediation & Infrastructure Improvements: Excavate the pond basin , reshape the dam embankment, and construct a new outfall structure. Scope of work encompasses all grading, turf establishment, ground stabilization, and comprehensive erosion and sediment control measures, to be designed by a Civil Engineer. Budget - $250,000 Construction Start: February 1 , 2027 Substantial Completion Date: May 3, 2027 Final Completion Date: October 1 , 2027 Facility and Location - Lexington High School / 2463 Augusta Highway, Lexington, SC 29072 Defined Project and Preliminary Scope - Elevator Modernization Modernization of one (1) elevator, including all mandatory Chapter 1 and SC-LLR inspections, accompanied by a one-year warranty. Budget - $ 125,000 Construction Start: May 27, 2027 Substantial/Final Completion Date: July 23, 2027 Question Deadline 10/07/2026 at 10:00 AM ET Questions must be received electronically.
GC Bidding
$4,875,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2026
February 1, 2027
Multiple Locations, Lexington, SC
Related To This Project
Lexington, SC
--
Lexington, SC
Bid Date: Nov 02 2026
Lexington, SC
Bid Date: Nov 02 2026
Lexington, SC
--
Lexington, SC
--
Lexington, SC
Bid Date: Sep 28 2026
Lexington, SC
--
Lexington, SC
--
Lexington, SC
--
Lexington, SC
--
Lexington, SC
Bid Date: Oct 26 2026
Lexington, SC
Bid Date: Oct 14 2026
Lexington, SC
Bid Date: Oct 15 2026
Lexington, SC
--
Lexington, SC
Bid Date: Sep 29 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed