Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 7, 2026 at 8:00 PM
Updated October 9, 2026
Site work and renovation of a multi-residential development in Iowa City, Iowa. Completed plans call for the renovation of a multi-residential development.
Comprehensive residential renovation including gutting, framing, extensive replumbing, electrical work, drywall, and finish carpentry. Replace all outlets, switches and cover plates throughout the home with new white ones. Install all new wired smoke detectors. Install a combination smoke CO detector in the hallway outside the bedrooms. Ensure that all are operating correctly. Run wiring and add dedicated breaker for smoke detectors to meet code. Manual: 1.00 EA 2 Install new circuit to power a new electric baseboard heater in the utility closet. Include installation of the heater and thermostat 3 Manual: 13.D.7. 1.00 EA Remove all hardware in the ceilings and walls throughout the house. Patch all holes, repair all bad spots, patches and texture throughout the house. Clean and prime all walls and ceilings with a sealing primer. Paint all ceilings a flat ceiling white and all the walls a satin finish . Wall color to be determined. Manual: 1.00 EA $ 4 Supply and install new light fixtures in bedrooms and living room. New light fixtures to be a minimum 1500 lumen each. Manual: 1.00 EA 5 Install new cabinets, formica counter tops and all plumbing as needed. Include a garbage disposal , Delta kitchen faucet, main kitchen light and light over the sink. Main light to be at least 5000 lumen and the sink light to be at least 600 lumen. Cabinets and counter top will be provided as per attached plan 6 Manual: 1.00 EA $ In the bathroom, remove the existing drywall with tile on the walls. Replace all drywall with new moisture resistant drywall and finish . Drywall over the opening for the small linen closet. That space is to be incorporated into the closet for the middle bedroom. Manual: 1.00 EA 7 Install the provided vanity and top in the bath. Supply and install a new toilet, medicine cabinet, light bar, vent fan/light unit, and bath hardware. Include all associated plumbing and fixtures including vanity faucet and tub shower faucet. Light bar to be at least 3 bulb and vent fan must vent to exterior of the home. Faucet shall be either Kohler, Delta or Moen. Bath hardware shall include toilet paper holder, 2 - 24" towel bars, a hand towel ring, and a shower curtain rod . Keep tub , replace surround with new tub surround unit. 8 Manual: 1.00 EAnstall appropriate drywall around electrical panel. Finish to match existing walls and ceiling.
GC Bidding
$470,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2026
December 4, 2026
Taylor Dr, Iowa City, IA
Related To This Project
Iowa City, IA
Bid Date: Nov 19 2026
Iowa City, IA
Bid Date: Nov 04 2026
Iowa City, IA
Bid Date: Oct 23 2026
Iowa City, IA
--
Iowa City, IA
Bid Date: Nov 17 2026
Iowa City, IA
--
Iowa City, IA
--
Iowa City, IA
--
Iowa City, IA
Bid Date: Oct 20 2026
Iowa City, IA
Bid Date: Oct 21 2026
UI Health Care John W. Colloton Pavilion - L5 - Perioperative 2nd Stage Recovery Expansion - 6286791
Iowa City, IA
Bid Date: Oct 06 2026
Iowa City, IA
Bid Date: Oct 14 2026
Iowa City, IA
Bid Date: Oct 13 2026
Iowa City, IA
--
Iowa City, IA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed