Published October 8, 2026 at 8:00 PM

Updated October 11, 2026

Demolition for a municipal facility in Salt Lake City, Utah. Completed plans call for the demolition of a municipal facility.

Demolition of the Peacock Blocks site. The project Base Bid consists of demolition of a six-plex (841-853 W. 400 South), three single family homes (857, 859, and 865 W. 400 South) and associated outbuildings down to natural ground level in preparation for future development. B. The following description is an outline of the work to be accomplished. The Scope of Work is as described in this document and any addenda issued by the Salt Lake City Community Reinvestment Agency (CRA). No drawings or technical specifications are provided. Bidders are responsible for verifying existing site conditions during the mandatory pre-bid site visit. C. Base Bid: Demolition and removal of all existing buildings down to the lowest level of the structure, including complete removal of all above-ground and below-ground elements such as superstructures, basements, cellars, retaining walls, foundations, and footings. Demolition will proceed down to natural ground level. Demolition will include removing all utility lines and capping at the main. Following demolition, all excavated voids resulting from the removal of substructures shall be backfilled using structural, non-expansive road-base or granular borrow (Class A- 1 , A- 1-a or A-1-b), and lot should be graded to match surrounding levels. All excavations requiring replacement fill of 24" or more shall be compacted to 90% maximum dry density. Independent, third-party testing is required following compaction of the first lift to verify compaction methods are sufficient to achieve the required density. CONTRACTOR will be responsible for public safety on and surrounding project properties, providing appropriate barricades or fencing for pedestrian safety during demolition. If the demolition is to take more than 10 days on any site, CONTRACTOR shall install a temporary fence around the perimeter of the property. D. Additive Alternate: None currently. 1.2 CONTRACT METHOD A. Perform the Work under a single lump sum contract Question Deadline 10/27/2026 at 5:00 PM MT Questions must be submitted via email to Taylee.foulger@slc.gov

Sub-Bidding

$400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
63
Bidding Soon
1,256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2026

December 4, 2026

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed