Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 24, 2026 at 8:00 PM
Updated October 29, 2026
Site work and renovation of a detention facility in Saint Louis, Michigan. Conceptual plans call for the renovation of a detention facility; and for site work for a detention facility.
Capacity realignment project at the St. Louis and Oaks Correctional Facilities. This questionnaire will be used by the Department of Technology, Management and Budget (DTMB) and an ad hoc advisory committee for the purpose of making an initial evaluation of architectural firms interested in providing architectural/engineering services for the MDOC Capacity Realignment projects to be located at the Oaks Correctional Facility located at 1500 Caberfae Hwy, Manistee, Michigan 49660 and the St Louis Correctional Facility located at 8585 N Croswell Rd, St Louis, Michigan 48880. Services will involve the following phases: _ _ Programming (confirming and updating programming provided as part of included study) Schematic Design (confirming and updating layouts provided as part of included study) _ Site Development _ Design Development Final Design Documentation including IT Design and Access Security Furniture, Fixtures, Equipment and Signage Construction Administration - Office Construction Administration- Field The project will consist of providing a proposal for Phase 200 Programming, Phase 300 Schematic Design, Phase 400 Preliminary Design, Phase 500 Final Design, and Phase 600 and 700 Construction Administration Office and Field Services for the MDOC Capacity Realignment projects to be located at the Oaks Correctional Facility and the St Louis Correctional Facility. The project encompasses the development of new housing facilities at two existing correctional facility campuses with sufficient land capacity to accommodate additional structures. At the St. Louis Correctional Facility (SLF), the proposal includes a new 176-bed Level V housing facility, consisting of four 44-bed housing units connected through a central core building. At the Oaks Correctional Facility (ECF), multiple viable locations have been identified for the addition of a new housing building. The concept under consideration includes 240 Level IV beds. The method of Contractor Selection has not been Determined at this time.
Conceptual
$154,322,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2027
Multiple Locations, Saint Louis, MI
Related To This Project
Saint Louis, MI
--
Saint Louis, MI
Bid Date: Jul 15 2026
Saint Louis, MI
Bid Date: Jul 15 2026
Saint Louis, MI
Bid Date: Jun 18 2026
Saint Louis, MI
Bid Date: Jun 25 2026
Saint Louis, MI
Bid Date: Jun 25 2026
Saint Louis, MI
--
Saint Louis, MI
Bid Date: Mar 24 2026
Saint Louis, MI
Bid Date: Mar 25 2026
Saint Louis, MI
Bid Date: Jan 22 2026
Saint Louis, MI
Bid Date: Nov 06 2025
Saint Louis, MI
Bid Date: Oct 23 2025
Saint Louis, MI
Bid Date: Nov 07 2025
Saint Louis, MI
Bid Date: Aug 28 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed