Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 8, 2026 at 8:00 PM
Updated October 13, 2026
Site work and paving for a playground / park / athletic field in Coventry, Rhode Island. Completed plans call civil work for a playground / park / athletic field.
Construction and installation of a path at Harris Playground. The Work of this Contract is installation of an ADA compliant footpath approximately 60 linear feet long and 5 feet wide from Howard Avenue to the playground. If a bidder has questions, requires additional information, or requires some clarification regarding the RFP, please contact (in writing ONLY via email) the following person at the Town no later than October 15 at 4:00pm: Scott Sevegny, Director of Parks and Recreation Department, at parksdirector@coventryri.gov. The Work of this Contract is installation of an ADA compliant footpath approximately 60 linear feet long and 5 feet wide from Howard Avenue to the playground. Budgetary Condition: The contract award is not automatic. Final approval is entirely contingent upon the selected proposal's total cost aligning with the approved project budget. Contractor to furnish all materials related to the completion of the job, to include removal of existing path, installation of tactile warning panel, excavation and disposal of subgrade material, installation and compacting 6" depth of gravel borrow subbase, laying and compacting of asphalt path to a finished depth of 2" of RIDOT Class I- 1 mix, loam and seed edges flush with existing lawn. A. Street Interface & Entry Transition o At the origin point on Howard Avenue, the contractor shall remove the existing pathway. Existing fencing along Howard Avenue shall remain. The contractor shall furnish and install a compliant Detectable Warning Panel directly embedded into the transition surface at the Howard Avenue right-of-way interface. The panels must feature compliant truncated domes, contrast visually with the adjacent walkway (e.g., Federal Yellow or Dark Brick Red as directed by the Town), and conform entirely to RIDOT Standard Detail 43.3.0. B. Excavation & Subgrade Preparation o The contractor shall clear all organic matter, loam, topsoil, and root systems down to a stable, unyielding subgrade across the full length of the approximately 60-foot alignment. Width of the path shall be 5 feet. Subgrade must be compacted thoroughly prior to the placement of any subbase aggregates. C. Subbase Course The contractor shall furnish, place, and compact a minimum of six (6) inches of Gravel Borrow conforming strictly to RIDOT Subsection M.01.02. Subbase must extend at least six (6) inches beyond the finished edge of the paved surface on both sides to prevent edge failure along the lawn. D. Surface Course (Asphalt) The contractor shall lay and compact a minimum finished depth of two (2) inches of Hot Mix Asphalt (HMA). The asphalt mix design shall be a fine- graded surface mix (conforming to RIDOT Class I- 1 or equivalent dense-graded surface course) to ensure a smooth, tightly sealed, pedestrianfriendly surface. Compaction must be achieved using an appropriate vibratory roller. Hand-tampers or small plate compactors are permitted only in tight radii or gate connections at the playground fencing where heavy machinery cannot pass. E. Slope, Geometry & ADA Compliance Cross Slope: The finished lateral cross slope shall be set between 1.5% and 2.0% maximum to ensure adequate water shedding across the lawn without violating federal ADA accessibility boundaries. A cross slope exceeding 2.0% will be rejected. Running Slope: The longitudinal grade must track natural topography while prioritizing a slope of under 5%. If grading conditions on-site force a slope greater than 5%, the contractor must immediately notify the Coventry project manager to coordinate landing/ramp mitigation. F. Site Restoration & Drainage The path must be graded to shed water away from the playground equipment areas. All disturbed lawn or park areas adjacent to the new path must be backfilled with clean topsoil, raked flush with the new pavement edge to eliminate tripping hazards, and seeded. G. General Protect the safety of the public on public ways and on public property, including the site, and exclude the public from the job site for the safety of the public and security of the Contractor's work and equipment. No sedimentation shall be allowed to discharge from the project work limits. Existing trees shall be protected from damage, including protection of root zones
Sub-Bidding
$850,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2026
November 19, 2026
108 Howard Ave, Coventry, RI
Related To This Project
Coventry, RI
Bid Date: Sep 09 2026
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Coventry, RI
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed