Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2026 at 7:00 PM

Updated November 25, 2026

Site work and new construction of a mixed-use development in Clearfield, Pennsylvania. Working plans call for the construction of a one-story above grade multi-residential development; and warehouse / distribution facility.

As of 11/20/2026 the bids exceeded the Owner's budget. Will be re-advertised. This project is to provide eighty-one (81 ) resident storage units, consisting of one storage unit for each apartment, and one new maintenance garage at the Edgewood Apartments complex. The project will be bid as a single coordinated development incorporating both the maintenance garage and storage buildings. The Scope of work includes: Storage buildings Nine groups of individual storage units, one unit for each apartment. Storage units to be grouped together under one roof to efficiently use available space on site. Roof to have architectural shingles. Each storage unit to be approximately 5 ft x 8 ft. Each storage unit will have one access door. Storage building walls to be CMU. One maintenance garage for the housing authority. Site Maintenance garage to be 36 feet x 32 feet. Exterior wall composition to be 2x6 wood studs with CMU R-21 Batt insulation in the walls, R-38 Batt insulation in the attic to meet energy codes. Maintenance garage will have water, sewage, heat, and a restroom. Access roads at the front of the storage buildings, connecting to the existing parking area Electric Access to the maintenance garage will be on the other side of the storage buildings away from the main road. Site MEP to the maintenance garage. LED lights in soffit of roof for the storage buildings. Power and lighting in the Maintenance Garage. Mechanical Heating in the maintenance garage. Plumbing Plumbing in the maintenance garage Bonds: 10% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Last day for questions will be Wednesday October 14, at 12:00pm. Any prospective bidder desiring an explanation or interpretation of the solicitation , specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening

Final Planning

$1,497,647.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
65
Bidding Soon
961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

March 22, 2027

Project location map

55 Valley View Dr, Clearfield, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed