Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 3, 2026 at 7:00 PM
Updated November 9, 2026
Renovation of a library in Cleveland, Ohio. Completed plans call for the renovation of a library.
The Roof Replacement Project consists of a complete replacement of the roof of the Sterling Branch , which measures approximately 5,664 square feet. All questions concerning the Project should be in writing and directed to Sharon Fallon via email (Sharon . Fallon@cpl.org). no later than 4:00 P.M. on October 23, 2026 All questions and answers will be shared via email to all plan holders on file. Bidders may submit requests for consideration of a proposed Substitution for a specified product, equipment, or service to Sharon Fallon via email (Sharon.Fallon@cpl.org ) no later than five (5) days prior to the bid opening. Additional products, equipment, and services may be accepted as approved Substitutions only by written Addendum. The Project will consist of removing all existing roofing materials and installing a new 30-year roof and insulation system on a flat roof measuring approximately 5,664 square feet in area The Project will also include modifications to the existing roof drains , restoration of stone coping, and replacement of a skylight, membrane flashing, and perimeter sheet metal fascia. Any hazardous material abatement will be performed concurrent with this Project and will be performed by a separate contractor. The Project will require coordination with a concurrent HVAC replacement project at the Sterling Branch wherever the two project scopes overlap. The Work is estimated to cost $234,940. A. Without force and effect on requirements of the contract documents, the descriptive of the work of the Contract can be summarized as follows: 1. Project Drawings TS- 1 , RC- 1 , RC-2 , RC-3, and RC-4 are for contractor reference only. Contractor shall visit the site, analyze and measure specific work items and otherwise be knowledgeable of the work required. 2. HVAC UNIT REPLACMENT DURING THE ROOF REPLACEMENT PROJECT ROOFING CONTRACTOR RESPONSIBILITY: a. The (Roofing Contractor) will coordinate the following items of work. 1. (Roofing Contractor) shall familiarize themselves with both roofing and HVAC construction documents as prepared by Taylor Consulting Group and Wright Engineering. 2. (Roofing Contractor) is responsible for this coordination between the HVAC contractor and the roof demolition and replacement. 3. Monitoring the removal of the existing HVAC units and keeping the existing curb openings and flashings watertight. 4. Demolition of the existing roofing and flashing systems to allow for the removal of the existing HVAC curbs. The watertight membrane flashing installation of the new HVAC curb. i. The HVAC contractor is responsible for setting the new curbs at the locations that the curbs will be installed into the roof system by the roofing contractor. 5. Making the new curb openings watertight until the placement of the new unit and monitoring the installation of the new unit to verify the watertight condition of the membrane flashings. 6. (Roofing Contractor) shall assume that work involved with the HVAC unit removal, curb removal, new curb installation, new HVAC unit installation, and waterproofing the existing and new curb opening will be after library hours or weekends. 3. EXISTING ROOF SYSTEM MAKEUP: a. Existing Roof System Components - (Main Roof Section - Refer to Roof Plan RC-1) 1. Light Weight Concrete over Clay Block Decking 2. 3" Polyisocyanurate insulation (Steep Asphalt) 3. 1/2" Wood Fiber Insulation (Steep Asphalt) 4. 3 Ply Smooth Surface Built-up Roof 5. 2 Ply Modified Bitumen Granulated Roof System. b. Existing Roof System Components - (Raised Roof Section - Refer to Roof Plan RC-1) 1. Light Weight Concrete over Clay Block Decking 3" Polyisocyanurate insulation (Steep Asphalt) "Wood Fiber Insulation (Steep Asphalt) 2. 3. 4. 3 Ply Smooth Surface Built-up Roof 5. 1 Ply Modified Bitumen Granulated Cap Sheet. 4. NEW ROOF SYSTEM MAKEUP: a. Main Roof Section - Refer to Roof Plan RC- 1 1. Light Weight Concrete over Clay Block Decking 2. SBS vapor barrier system over primed light weight concrete. 3. 2-layer of 2.6" polyisocyanurate insulation in insulation adhesive. 4. Cover board in insulation adhesive. 5. 2-Ply Modified Bitumen Granulated Roof System. b. Raised Roof Section - Refer to Roof Plan RC- 1 1. Combination of wood plank decking and metal decking. 2. SBS vapor barrier system over mechanically attached coverboard. 3. 1 -layer 2" polyisocyanurate insulation in insulation adhesive. 4. 1-4" sloped tapered polyisocyanurate insulation in insulation adhesive. 5. Cover board in insulation adhesive. 6. 2-Ply Modified Bitumen Granulated Roof System 5. ROOF SYSTEM REQUIREMENTS: a. It is mandatory that the work be done in a manner that no weather element (rain, wind, dirt, snow, etc.) penetrates through the roof assembly into the enclosed building space. Special care is to be taken to limit the work of a day so that such weather protection occurs. A watertight tie on is required at the end of each workday. 1 . At the end of each work day or when precipitation is threatening the newly installed roof system. Utilize roofing application as necessary to furnish a complete watertight night seal. b. Provide all staging, scaffolding and erection necessary to complete specified roof replacement work. Contractor shall properly barricade staging work areas with temporary fencing and shall protect building materials from damage at all times. Dumpsters, bathroom facilities, and ground material storage shall be located within the construction staging area. c. Contractor shall keep the grounds clean. Any damage to the green belt area or surrounding pavement shall be the sole responsibility of the Contractor. Special care shall be taken during the demolition phase to minimize the level of debris accumulation. d. Full compliance with all applicable safety requirements including federal OSHA, state and local requirements. e. Contractor's operations shall at all times be conducted to protect contents and persons within the facility and to prevent spread of materials or debris into the interior of the building. Maintain good housekeeping practices, debris shall not be allowed to accumulate, but will be removed from the site on a daily basis. At the completion of the job, all areas shall be left clean to the satisfaction of the Owner's representative. f. The roof replacement shall generate the least amount of construction debris practical. Manage the construction process to minimize the generation of construction debris due to error, poor planning, breakage, mishandling, contamination, or other factors shall be employed at all times. Construction debris disposal in landfills shall be minimized to the greatest extent practical. g. Contractor personnel shall conduct themselves in a professional and workmanlike manner with a minimum of noise and confusion. Boisterous conduct, harassment and profane language on the job are prohibited. Cooperation with building Owner and occupants shall be deemed essential to assure progress of Work. h. Cleveland Public Libraries are NON-SMOKING facilities; no smoking will be permitted in or on Cleveland County Public Library properties. 6. ROOF SYSTEM REMOVAL: a. Interior Protection: (All locations and especially at raised roof locations with wood/metal decking and skylight replacement locations) 1. The roofing contractor is responsible for covering and protecting interior building property from dirt, debris, paint drippings generated during the existing roof removal process, as well as, daily interior clean up after the removal of the existing roof system and installation of the new roof system. 2. Interior dirt and debris will be generated during the removal of the existing BUR and insulation systems. 3. Contractor shall install and remove interior protection and containment systems daily at the location of their sectional work area. The roofing contractor is responsible for covering and protecting staff employees and visitors to the Cleveland Public Library - Sterling Building. The roofing contractor containment system shall protect the interior building property from dirt, and debris. b. Removal of the insulation, field membrane, flashing membrane, and sheet metal systems down to the existing decking. Contractors must keep the grounds clean. Any damage to the green belt area shall be the sole responsibility of the Contractor. Contractor shall provide a demolition plan, to be approved by Consultant, prior to work start up. c. Repairs must be made to any surface condition that will not allow the new roof system to lie flat. The deck must be clean and smooth prior to the installation of the new roof systems. d. The roofing contractor is responsible for verifying under deck locations of existing conduit. The roofing contractor is fully responsible for repairing any damage to the existing electrical conduit or electrical fixtures. 7. METAL / WOOD DECK REPLACEMENT: (REFER TO ALLOWANCE SCHEDULE) a. Prior to the start of the roof system replacement work the contractor shall investigate the existing steel / wood decking to determine type and design thickness. b. Complete steel/wood deck submittal package must be submitted and approved by Taylor Consulting Group prior to ordering and the start of roof system construction. c. The roofing contractor is responsible for verifying under deck locations of existing conduit. Conduit locations shall than be marked on the steel decking so that the roofing contractor will avoid attaching a mechanical fastener securing the roof installation into the conduit. The roofing contractor is fully responsible for repairing any damage to the existing electrical conduit. d. The roofing contractor is responsible for working with building maintenance associates in protecting designated critical equipment locations and employee personnel during the roof replacement, steel deck replacement. e. Anchor steel / wood deck units to steel supporting members every other rip with approved mechanical fasteners, product data must be submitted and approved prior to the start of construction. Within 10 ' of perimeters and at 10 ' x 10' corners anchor steel deck units to steel supporting members at every rib. There must be at least one supporting bar joist between deck replacement locations. f. Fasten side laps of deck units with spans greater than 5 feet at mid span or 36" intervals, whichever distance is smaller using # 10 self-drilling screws.
Post-Bid
$234,940.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2026
December 2, 2026
2200 E 30th St, Cleveland, OH
Related To This Project
Cleveland, OH
Bid Date: Oct 27 2026
Cleveland, OH
Bid Date: Dec 04 2026
Cleveland, OH
Bid Date: Oct 15 2026
Cleveland, OH
Bid Date: Nov 06 2026
Cleveland, OH
Bid Date: Nov 10 2026
Cleveland, OH
Bid Date: Oct 14 2026
Cleveland, OH
Bid Date: Oct 15 2026
Cleveland, OH
Bid Date: Oct 22 2026
Cleveland, OH
Bid Date: Oct 15 2026
Cleveland, OH
Bid Date: Oct 09 2026
Cleveland, OH
Bid Date: Oct 28 2026
Cleveland, OH
Bid Date: Dec 31 2026
Cleveland, OH
Bid Date: Nov 03 2026
Cleveland, OH
--
Cleveland, OH
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed