Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 8, 2026 at 8:00 PM

Updated October 10, 2026

Site work for a water / sewer project in Saint George, South Carolina. Completed plans call for site work for a water / sewer project.

Remove the existing pump. New submersible assembly. Furnish and install a Grundfos 385S400-6B-6, 8-inch, six-stage pump end with a 40 HP SME, 230-volt, three-phase submersible motor. Include 150 feet of 4-inch Schedule 40 galvanized threaded-and-coupled drop pipe. New VFD. Furnish, mount, connect and program a Grundfos CUE VFD. Install and set the new assembly connect to the existing discharge piping and VFD, and perform startup and operational testing. Prime Contractor License (Special Standard of Responsibility): Bryant Moore

GC Bidding

$500,000.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
97
Bidding Soon
1,142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

November 20, 2026

Project location map

I-95 US-78, Saint George, SC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed