Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 24, 2026

Site work and new construction of a water / sewer project in Beaver Dam, Wisconsin. Completed plans call for the construction of a water / sewer project.

Installation of a new diesel fueled engine generator, including a concrete mounting pad, associated electrical equipment and gear, limited site grading, and erosion control. Bonds: 5% Bid Bond, Certified Check required. Question Deadline 10/26/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. City of Beaver Dam , Jeremy Klug- Director of Utilities, jklug@ci.beaverdam.wi.gov Questions received less than seven days prior to the date for opening of Bids may not be answered. The work is summarized as follows: 1 . 23 Provide wellhouse back- up power system , including a new minimum 150-kW, diesel fueled engine generator, automatic transfer switch, fused disconnect switch , diesel fuel tank, monitoring control panel , and related equipment. Provide concrete pad for mounting generator and tank. Provide circuits, as required , for generator appurtenances. Work including conduits, wire, and related equipment. Provide programming to integrate utility power signals into City SCADA System and screens. Provide all work, equipment, and materials to provide complete and operable project.

GC Bidding

$600,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
96
Bidding Soon
1,867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

December 2, 2026

Project location map

8331 Kellom Rd, Beaver Dam, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed