Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 14, 2026

Site work and renovation of a water / sewer project in Edgewater, Florida. Completed plans call for the renovation of a water / sewer project.

Replacement of aging 2-inch galvanized iron potable water mains with new 3-inch and 6-inch HDPE water mains, including open-cut and horizontal directional drilling, installation of a water main loop, and replacement/relocation of one fire hydrant. Question Deadline 10/22/2026 at 3:00 PM ET All questions related to this ITB shall be submitted in writing through the Question/Answer Tab via the City's e-Procurement portal Pre bid Join instructions https://us06web.zoom.us/meetings/89779237591 /invitationssignature=8XPSObdCwg4KjznnYJHYNKuZde29VKuNb G7KvdEcO PLEASE NOTE - an onsite visit will occur immediately after the Pre- Bid meeting. This visit will NOT be available via Zoom SCOPE AND INTENT This project consists of a replacement of an existing 2-inch galvanized iron potable water main along Lee Drive and Denson Drive with a new 3-inch DR- 11 PE Water Main at Silver Circle replacing the existing water main along Lee Drive via installation of 1,090 linear feet of 3- inch DR-11 PE open-cut water main and 150 linear feet of 3-inch horizontal directionally drilled DR-11 PE water main. The new main will connect to the existing 6-inch water main at Silver Circle and extend along Lee Drive. It will also tie into the existing 6-inch asbestos cement water main along Silver Circle, connecting to the proposed main along Lee Drive. Additionally, a loop in the water main is proposed by directional drilling approximately 180 linear feet of 8- inch DR-11 PE 4710 water main from Silver Circle to Glenwood drive connecting via two tapping sleeves and valves. WORK INCLUDED The Contractor shall furnish all supervision, labor, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for the proper performance and completion of the work. Contractor shall obtain and pay for all required permits, if identified. Contractor shall perform and complete the work in the manner best estimated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Owner, and in strict accordance with the Contract Documents. The Contractor shall clean up the work and maintain it during and after construction, until accepted , and shall do all work and pay all costs incidental thereto. Contractor shall repair or restore all structures and property that may be damaged or disturbed during performance of the work.

GC Bidding

$415,950.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
113
Bidding Soon
1,743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2026

December 10, 2026

Project location map

Lee Drive and Denson Drive, Edgewater, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed