Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 30, 2026 at 8:00 PM
Updated November 1, 2026
Demolition, site work and renovation of a water / sewer project in Des Moines, Iowa. Completed plans call for the renovation of a water / sewer project; and for the demolition of a water / sewer project.
Removal and replacement of sludge collection equipment in two water treatment basins (Treatment Basin No. 4 and Pre-Sedimentation No. 2), including drive systems, chains, sprockets, electric motors, and process water piping. The work includes, but is not necessarily limited to: 1. Disassembly and removal of existing head and idler shafts, primary and secondary drive sprockets, collector chains, flight boards and miscellaneous related sludge collection equipment from lower level of Treatment Basin No. 4 (2027), and Pre-Sedimentation No. 2 (2028). 2. Handling and storage of all salvaged materials in staging area (s) shown on Plans. 3. Reinstallation of new or refurbished sludge collection equipment provided by the Owner including shafts, sprockets, collector chains, flight boards and miscellaneous equipment and attachments. 4. Installation of new electric motors and gearboxes and rebuilding of existing drive system for sludge collection equipment. 5. Alignment and adjustment of assembled equipment as necessary to achieve proper function. 6. Demolition of existing process water piping and appurtenances and installation of new process water system. 7. Removal and proper disposal of all unused equipment and materials from the Project site. 8. Note that the flight boards and chains in the center bay will be removed and will not be reinstalled. Completion- (90) consecutive calendar days Bonds: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. The estimated cost for the project is $450,000.
GC Bidding
$450,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2026
December 3, 2026
2201 George Flagg Pkwy, Des Moines, IA
Related To This Project
Des Moines, IA
Bid Date: Nov 05 2026
Des Moines, IA
Bid Date: Nov 05 2026
Des Moines, IA
Bid Date: Nov 05 2026
Des Moines, IA
Bid Date: Oct 27 2026
Des Moines, IA
Bid Date: Nov 03 2026
Des Moines, IA
Bid Date: Dec 01 2026
Des Moines, IA
--
Des Moines, IA
--
Des Moines, IA
Bid Date: Oct 19 2026
Des Moines, IA
Bid Date: Oct 19 2026
Des Moines, IA
--
Des Moines, IA
Bid Date: Oct 15 2026
Des Moines, IA
--
Des Moines, IA
Bid Date: Nov 06 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed