Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 14, 2026

Demolition, site work, paving, new construction and addition to a mixed-use development in Dover, Delaware. Design plans call for the demolition of a 140,382-square-foot educational facility; for the construction of a educational facility; and for the addition of a 36,098-square-foot educational facility.

Demolition of an existing 140,382 SF school building and portion of the Kent County Community School (KCCS) and construction of a new 81,362 SF Kent County Secondary Intensive Learning Center, a 36,098 SF addition for KCCS, and a head house for a new geothermal system.

Design

$55,000,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
674
Active Projects
286
Bidding Soon
3,925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2027

Project location map

65 Carver Road, Dover, DE

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed