Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

This is a service / maintenance or supply contract in Kernersville, North Carolina. Contact the soliciting agency for additional information.

Complete a feasibility study that would analyze the potential alignments for an extension of the Piedmont Greenway from East Forsyth High School to the existing Kerner Mill Creek Greenway. The western terminus of this greenway project would connect to the future terminus of the Piedmont Greenway at East Forsyth High School The eastern terminus will connect to the existing Kerner Mill Creek Greenway Kernersvilles Pope Park The study proposes to assess the feasibility of two options for installing a multiuse path as shown below. Both options aim to provide safe and efficient bicycle and pedestrian access to an area that includes area schools commercial and residential areas and recreation facilities (including a future pool at Pope Park). Considerations will include the need for potential rights-of-way acquisitions and utility relocations. In addition to improving bicycle and pedestrian transportation options, economic benefits, recreation, public health and community place-making are all aspects that will be inherent to the considerations of options. This will be accomplished by producing a concise report on alignment options with cost estimates. At least one public outreach event shall be provided for local stakeholders. If your firm has not renewed its application as required by your anniversary date or if your firm is not currently prequalified, please submit an application to the Department prior to submittal of your LOI. All submissions, correspondence, and questions concerning this RFLOI should be directed to Christopher Jensen at cjensen@toknc.com. If Applicable, questions may be submitted electronically only, to the contact above. Responses will be issued in the form of an addendum available to all interested parties. Interested parties should also send a request, by email only, to the person listed above to be placed on a public correspondence list to ensure future updates regarding the RFLOI or other project information can be conveyed. Questions must be submitted to the person listed above no later than October13, 2026. The last addendum will be issued no later than October 16, 2026. NCDOT - RFP - Kerner Mill Creek Greenway Feasibility Study

Conceptual

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
88
Bidding Soon
2,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2026

Project location map

Multiple Locations, Kernersville, NC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed