Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 12, 2026 at 8:00 PM

Updated October 18, 2026

Site work and new construction of a mixed-use development in Green Cove Springs, Florida. Conceptual plans call for the construction of a playground / park / athletic field; and sidewalk / parking lot.

Engineering services for design and permitting of a 3.5-mile shared-use non-motorized trail. Scope includes feasibility analysis and engineering design for 0.5 miles on concrete pilings, 0.5 miles of boardwalk over wetlands, and 2.5 miles of standard sidewalk. Question Submission Deadline:November 3, 2026, 2:00pm

Conceptual

$450,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
87
Bidding Soon
1,415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2026

November 9, 2027

Project location map

To Be Determined, Green Cove Springs, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed