Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2026 at 8:00 PM

Updated November 1, 2026

Site work and new construction of a recreation facility in Kansas City, Missouri. Completed plans call for the construction of a recreation facility.

Construction of a new skating facility. The goals for this specific Project are 30% SLBE participation The construction of approximately 16000 Square Feet skating facility will includes the following principal items: 1. coordinating construction sequencing, site safety and logistics together with local subcontractors. New Line Skateparks be responsible for project and site management during the course of construction. 2. Build a custom concrete skatepark facility that reflects the approved Construction Drawings, Specifications and known site conditions. This work will INCLUDE: o o . o o o o All necessary project bonding and insurance as specified in the contract documents. Site mobilization, temporary facilities, clean-up and demobilization. Bulk civil work: All necessary civil work operations including demolition and removals (where necessary), subgrade establishment and installation of subbase material. Installation of the drainage and stormwater management improvements. Specialty/detailed civil works and feature shaping: installation and fine shaping of all granular base materials. Specialty concrete work: complete all work associated with the forming, placing and finishing of all concrete and shotcrete terrain features and rideable flatwork. Specialty steel work: complete all work associated with the fabrication and installation of steel work including steel coping/edging, grind rails and other miscellaneous steel, including the preparation of shop drawings. Obtain Substantial Completion and Final Acceptance certificates from the City for the identified scope of work, including provision of a one-year warranty period following Substantial Completion. Preparation of a maintenance manual for the skatepark component, identifying recommended regular maintenance activities and repair methods for wear and tear caused by typical use All questions about the meaning or intent of the Bidding Documents may be directed to the Project Manager listed at the end of these Instructions to Bidders. Interpretations or clarifications considered necessary by the Project Manager in response to such questions will be issued by Addenda to all parties recorded as having received the Bidding Documents

GC Bidding

$4,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
60
Bidding Soon
1,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2026

December 28, 2026

Project location map

500 W 5th St, Kansas City, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed