Published October 13, 2026 at 8:00 PM

Updated November 22, 2026

Site work and new construction of a water / sewer project in Salem, New Hampshire. Completed plans call for the construction of a water / sewer project.

Installation of up to 10,800 feet of new water main on Lake St, Bluff St, 2nd St and 3rd St. Work includes, but is not limited to, the installation of up to approximately 9,700 linear feet of 16, 12, 8, and 6-inch ductile iron main and fittings, installation of 16, 12, 8 , and 6-inch gate valves, new hydrants, water services, installation of a temporary water system, installation of temporary flow diversion system to support open-cut installation of approximately 70 linear feet of 12-inch HDPE water main within wetland areas around existing Hitty-Titty Brook culvert, permanent trench paving, and surface restoration, where required. Work may also include Bid Alternate No. 1 , which includes installation of approximately 1,100 linear feet of 8-inch ductile iron main and fittings on 2nd Street and 3rd Street, connecting to existing water mains, water services, pavement restoration, and surface restoration, where required. Work may also include Bid Alternate No. 2, which includes full-width mill and overlay of the Lake and Bluff project area, consisting of approximately 9,000 linear feet. Questions due no later than Wednesday, October 21, 2026 by 4:00 pm to Purchasing Agent, gfaccadio@salemnh.gov. 1. Completion time for the project shall be as follows: Substantial Completion: October 1 , 2027 Final Completion: November 5, 2027 2. Completion time for the project shall be adjusted as follows to include Bid Alternate No. 1 ifaccepted by Owner: Substantial Completion: May 19, 2028 Final Completion: June 16, 2028 3. Completion time for the project shall be adjusted as follows to include Bid Alternate No. 2 ifaccepted by Owner: Substantial Completion: May 19, 2028 Final Completion: June 16, 2028 4. Completion time for the project shall be adjusted as follows to include Bid Alternate No. 1 andNo. 2 if accepted by Owner: Substantial Completion: May 19, 2028 Final Completion: June 16, 2028 The Bidder further agrees to pay liquidated damages in the amount of $ 1,700.00 for each milestone,

Post-Bid

$3,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
699
Active Projects
253
Bidding Soon
4,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2026

January 19, 2027

Project location map

Multiple Locations, Salem, NH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed