Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2026 at 8:00 PM

Updated November 2, 2026

Site work and new construction of a communication facility in French Camp, California. Completed plans call for the construction of a communication facility; and for site work for a communication facility.

Installation of an LED billboard. There will be no pre-bid site walk or visit for this project. Bidders do not need to attend an inperson meeting to submit a bid Bidders must make sure that they meet the minimum requirements of the RFB. Any questions, concerns, or clarifications about the RFB must be emailed to vgagnon@sjgov.org on / before Monday, October 5, 2026 @ 5:00 PM PST. PROJECT DESCRIPTION A. 5. This project shall consist of the installation of the LED Billboard sign power feeder and associated power quality equipment, protective equipment, submetering, power filtering, and surge and lightning protection. The project is located at the Health Plan of San Joaquin building (HPSJ) located at 7751 S. Manthey Road, French Camp, CA, 95231 - The Owner being The County of San Joaquin (SJC). The major electrical work shall include, but not limited to: Selective site preparations and approvals for construction improvements. Procuring all approvals, permits, and inspections for project. B. . Revenue sub-meter for LED Billboard feeder circuit monitoring. Feeder circuit and accessories from electrical room to LED billboard. Installation of Active Harmonic Filter (AHF) in electrical room. Primary and secondary surge suppression and Lightning Protection System (LPS). Undergrounding street feeder circuit conduit using directional boring. Coordination with LED billboard vendor installation work. Programming LED billboard controller as required by Owner. Electrical work as shown on all project documents, including connection of supplied equipment. Coordination and installation of structural details for equipment mounting. Coordination of commissioning, startup, testing, and inspections. 13. Owner training, maintenance schedule, and warranty transfer.

Post-Bid

$750,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
588
Active Projects
213
Bidding Soon
3,719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

November 20, 2026

Project location map

7751 S Manthey Rd, French Camp, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed