Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 9, 2026

Site work and new construction of a mixed-use development in Gulfport, Mississippi. Completed plans call for the construction of a educational facility; and playground / park / athletic field.

Construction of a new artificial turf practice field at Harrison Central High School. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Question Deadline 10/30/2026 at 11:00 AM CT Email all questions to haa@hardyarchitect.com or marty@hardyarchitrect.com, or jaime@hardyarchitect.com The current Certificate of Responsibility Number of the bidder shall appear on the outside of each sealed envelope containing a proposal , said envelope being plainly marked "PROPOSAL FOR - Harrison Central High School - New Turf Practice Field" The Project consists of the construction of a new turf practice field , and associated site work on the respective campus as shown on the Contract Documents, dated October 4, 2026 Contractors are required to visit the site prior to bidding to become familiar with and aware of existing conditions. If the contractor fails to visiting the site, they will not be relieved of performing work that he or she is not aware exists. Please contact the owner (Robert King at 228-697-3001) to make arrangements for site visits. Any damage to building materials, interior or exterior, related to or as a result of this work during construction is to be replaced with new material or products at no additional cost to the owner. The project work site, access to and area surrounding the work site shall be cleaned on a daily basis. All safety and Security fencing/features for the construction site and buildings shall be provided by the contractor and shall be maintained at all times. In the event of an emergency, the construction site will be used as a means of exiting the existing building to maintain all life safety measures currently in affect and exits. If warranty work is required by the General Contractor or Manufacturer during the life of the warranty period , the owner will not be responsible for providing a ladder or lift. The general contractor or manufacturer will be required to provide their own means to perform their work. G. Contractor is required to coordinate with the owner and an on site superintendent shall be provided and on site at all times if work is being performed on site. H. I. J. In order to meet the construction timeframe, the Contractor shall provide the required manpower and equipment to complete the project per the construction time frame and or completion date set for the contract/construction phase if not otherwise noted. It is the intent of the Contract Documents to describe a functionally complete project, general arrangements, design and extent of work to be constructed in accordance with the Contract Documents. The contract documents are not intended to be shop drawings. Any work, material or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words, which have a well known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. All contractors are to stay within the work area and any and all contact with students will not be tolerated and is strictly prohibited . If a contractor/worker is caught outside the work area or made contact with a student, they will be asked to leave and or be arrested . (This excludes contact with immediate family members.) K. Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the work, take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before bidding and commencing any portion of the work. If during the bidding or performance of the work Contractor discovers a conflict, error or discrepancy in the Contract Documents, Contractor shall immediately report same to architect in writing and before proceeding with the work affected thereby shall obtain a written interpretation or clarification from the architect. If the contractor proceeds with any work not approved, any and all costs will be the responsibility of the contractor, not the owner. GENREAL CONTRACTOR AND SUB-CONTRACTORS: "PLEASE BE AWARE!!!!" THERE ARE A NUMBER OF UNDERGROUND ELECTRICAL, WATER AND SEWER LINES AROUND THE SITE NOT SHOWN IN THE CONTRACT DOCUMENTS. IF AN EXISTING ELECTRICAL, WATER OR SEWER LINES ARE DAMAGED DURING CONSTRUCTION, THEY SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE, NOT THE OWNER. WE RECOMMEND THE CONTRACTOR TAKE ALL NECESSARY MEASURES TO ENSURE THAT ALL EXISTING ABOVE AND BELOW GROUND UTILITIES ARE LOCATED ON SITE PRIOR TO STARTING CONSTRUCTION . M. ALCOHOL OR TOBACCO PRODUCTS OR FIRE ARMS ARE NOT ALLOWED/PROHIBITED ON ANY HARRISON COUNTY SCHOOL DISTRICT PROPERTY. ANY PERSONS VIOLATING THIS REQUIREMENT WILL BE ASKED TO LEAVE THE CAMPUS AND OR BE ARRESTED. All Manufacturers providing material or products on this project shall inpsect the installation of their material or products during construction and issue a report that the material or products were installed per the manufacturers installation recommendations and current adopted codes. Each manufacturer shall visit the site a minimum of three times during the installation of their product. A Pre-installation meeting shall be held , construction inspection or inspections depending on the amount of material to be installed shall be provided and a final inspection prior to issuing a warranty shall be provided . If materials or products are not installed per the manufacturer installation requirements, it shall be the Manufacturers and Contractors Responsibility to remove and replace the material or product at no additional cost to the owner. The construction documents, including drawings and specifications, describe a complete project. The general contractor shall provide the owner with a usable and working product. If there is a conflict between the drawings and/or specifications with no clarification Issued , the bidder shall bid the more stringent/rigorous/higher quality product or application. No allowance or monetary value in the contractor's favor shall be made by virtue of Conflicts, errors, or omissions. The owner will not be held liable or responsible for any cost escalation after bidding. The contractor shall provide materials and adequate personnel to complete the project within the contract time noted . This shall be done as a part of the contract documents and shall not be an additional cost to the owner if the contractor has to accelerate their work to meet the project completion date. This may include, but is not limited to, purchasing materials in advance to accommodate extended lead times, providing additional staff/manpower/equipment when a project is behind schedule, and mediating soils after heavy rains. Q. The General Contractor is responsible for all means and methods of drying out the site prior to starting any work and at any point during construction as required to perform the work and to complete the project within the time frame noted. R. This is not a LEED project. All products used on this project shall be ASBESTOS FREE.

Post-Bid

$1,200,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
105
Bidding Soon
1,067
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2026

November 17, 2026

Project location map

15600 School Rd, Gulfport, MS

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed