Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 22, 2026

Renovation of an educational facility in Falmouth, Massachusetts. Conceptual plans call for the renovation of a educational facility.

Requesting the services of an Owner's Project Manager (OPM) to represent the owner during the feasibility study, schematic design, design development, construction documents, bidding, construction, and closeout phases for the school renovation project. Question Deadline 10/26/2026 at 4:00 PM ET Falmouth Public Schools Attn: Paul J. Dart, Director of Finance and Operations 340 Teaticket Highway East Falmouth, MA 02536 (508) 548-0151 procurements@falmouth.k12.ma.us *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$175,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
605
Active Projects
313
Bidding Soon
3,824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed