Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 19, 2026

Site work, new construction and renovation of a mixed-use development in East Chicago, Indiana. Completed plans call for the construction of a playground / park / athletic field.

The City of East Chicago, Indiana is seeking sealed proposals in response to a Request for Proposals (RFP) to procure and install recreation upgrades at the following parks: Kosciuszko Park, Nunez Park, Sunnyside Park, and Marktown Park. This will include repaving of basketball courts, restriping and adjustment of basketball goals, installation of one new basketball court, installation of a minimum of two pickleball courts and accessories, exercise equipment, playground equipment, benches , picnic tables, and trash cans. Project to be completed by November 30, 2026. Bonds: Certified Check required, 5% Bid Bond. MBE (10%), WBE (5%) Kosciuszko Park* Work entails resurfacing the existing basketball court surface and pushing each court closer to their respective corners of the court areas to create more distance between each. Courts will be striped with smaller court dimensions in order to maintain a total of four (4) courts. Two (2) benches will be added for each court on the outside long side of the court and located one per half court. Belson Mall Style Bench 6' Model 932SM-V6. Basketball goals will be removed and reinstalled per the new court dimensions. Install ten (10) additional benches at locations determined by the Recreation Department throughout the park. Belson Outdoor Commercial Steel Outdoor Bench with Straight Back, Model CBPB-6SB-BK or approved equal. Install five (5) automatic trash receptacles at locations determined by the Recreation Department throughout the park. Bigbelly Smart Max Trash Automatic Bins or approved equal. Nunez Park* Work entails resurfacing the existing basketball court surface and elimination of the center court to allow more social distancing. Courts will be restriped with dimensions increased to approximately standard basketball court dimensions. Two (2) benches will be added for each court on the outside long side of the court and located one per half court. Belson Mall Style Bench 6' Model 932SM-V6. Basketball goals will be removed and reinstalled per the new court layout. Install ten (10) additional benches at locations determined by the Recreation Department throughout the park. Belson Outdoor Commercial Steel Outdoor Bench with Straight Back, Model CBPB-6SB-BK or approved equal. Install five (5) automatic trash receptacles at locations determined by the Recreation Department throughout the park. Bigbelly Smart Max Trash Automatic Bins or approved equal. Sunnyside Park* Work entails resurfacing the existing basketball court surface and eliminating the middle court to create more distance between each. Also, courts will be restriped with dimensions increased to approximately standard basketball court dimensions. Two benches will be added to each court on the outside long side of the court. Belson Mall Style Bench 6' Model 932SM-V6. Basketball goals will be removed and reinstalled per the new court dimensions. Construct new basketball court to the east of the existing basketball courts. Relocate walking path as needed to accommodate new basketball court and maintain access through park. Include stripping and basketball goals for new court. Install ten (10) additional benches at locations determined by the Recreation Department throughout the park. Belson Outdoor Commercial Steel Outdoor Bench with Straight Back, Model CBPB-6SB-BK or approved equal. Install five (5) automatic trash receptacles at locations determined by the Recreation Department throughout the park. Bigbelly Smart Max Trash Automatic Bins or approved equal . Install eight (8) station fitness area and asphalt surface (approximately 24'x36' pad area) for installation of fitness area location to be determined by the Recreation Department. Outdoor Workout Supply PFT103 -I Playground Fitness No Shortcuts Outdoor Fitness Equipment Package - Inground, Black/Silver or approved equal . Install per manufacturer's recommendations. - Install pavilion approximately 24'x36' over fitness area with metal gable roof. 8' clear space under roof minimum two (2) bays wide by three (3) bays long. Install play structure for youth ages 2-12, location to be determined by the Recreation Department. Willy Goat - Amazing Antelope Playground Structure (approximately 60'x70' pad area) or Gabby Gibon Playground Structure or approved equal (approximately 56'x55' pad area). Install Pour-n-Place under new play structure, provide alternate bid price for ADA compliant mulch. Install per manufactures recommendations. Marktown Park* Work entails resurfacing the existing deteriorated rear basketball court surface. Court surface will be restriped for a minimum of two pickleball courts. Two (2) benches will be added to each court on the outside long side of the court. Belson Mall Style Bench 6' Model 932SM-V6. Basketball goals will be removed, and all required accessories (nets, etc. ) will be installed per the requirements for pickleball play. Install six (6) additional benches at locations determined by the Recreation Department throughout the park. Belson Outdoor Commercial Steel Outdoor Bench with Straight Back, Model CBPB-6SB-BK or approved equal. Install five (5) automatic trash receptacles at locations determined by the Recreation Department throughout the park. Bigbelly Smart Max Trash Automatic Bins or approved equal. Communications Concerning RFP: All questions relevant to the development of a proposal are to be directed to: Ms. Alysia Dunbar, Programs Manager Department of Redevelopment City of East Chicago 4525 Indianapolis Blvd. East Chicago, IN 46312 Phone: (219) 516-2090 Email : adunbar@eastchicago.com

GC Bidding

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
560
Active Projects
221
Bidding Soon
3,644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2026

November 23, 2026

Project location map

Multiple Locations, East Chicago, IN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed