Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 28, 2026

Site work and new construction of a municipal facility in Neosho, Missouri. Completed plans call for the construction of a municipal facility.

Installation of a new gate at the recycling center facility. Bonds: 100% Performance Bond. Questions concerning the specifications and bid procedure should be directed to Bo Noah , Public Works Director, at the follow address/phone: 417-451-8071 , 200 Nelson Ave, Neosho, MO 64850 Gate Specifications The contractor shall field verify all dimensions prior to fabrication. No gate construction shall begin until all measurements have been confirmed at the project site. Gate Requirements Furnish and install two (2) cantilever gates, each providing a 25-foot clear opening. Gates shall be constructed entirely of Schedule 40 steel pipes. Chain-link fabric shall match the existing fence: 2" mesh 9-gauge galvanized wire Class KK coating 2.0 oz. zinc coating Gate frames shall include: O 2-1/2" Schedule 40 top rail 2-1/2" Schedule 40 bottom rail 2-1/2" Schedule 40 center rail welded horizontally through the center of the gate frame to minimize flexing from wind loads. Angled bracing/supports shall be welded into the gate frame to prevent sagging and maintain structural integrity. All welds shall be continuous and completed in a professional manner. Hardware Requirements Cantilever roller assemblies shall utilize nylon rollers only. Metal rollers will not be accepted. Gates should be designed for heavy-duty commercial use and frequent vehicle traffic. Gates shall include all required posts, rollers, brackets, guides, hardware, and accessories necessary for a complete installation. o Gate latch mechanism shall : Support the use of padlock. Allow locking and unlocking from both the inside and outside of the gate. Installation Securely hold the gate in the closed position. Contractors shall provide all labor, materials, equipment, concrete, and incidentals necessary for complete installation. Contractor shall be responsible for locating existing utilities before excavation. o Site shall be cleaned and restored upon project completion.

Post-Bid

$15,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
82
Bidding Soon
1,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2026

November 23, 2026

Project location map

4700 Howard Bush Dr, Neosho, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed