Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 19, 2026

Site work for a playground / park / athletic field in McDonough, Georgia. Completed plans call for site work for a playground / park / athletic field.

The Richard Craig Park Athletic Complex Renovation is a comprehensive turnkey modernization of one of Henry County Parks & Recreation's premier baseball and softball facilities. The project includes the phased renovation of eight conventional baseball and softball fields, the Sunshine League therapeutic field, the concession facility, and all associated site improvements necessary to deliver a fully operational, safe, ADA accessible, and tournament-quality athletic complex capable of supporting recreational programming, league play, Sunshine League activities, regional tournaments, and community events. Construction shall be completed in two phases to minimize disruptions to park operations and recreational programming. Phase One shall include the complete renovation and turnover of Fields 1 through 5, including all associated infrastructure and site improvements required to place those facilities into full operational service. Upon completion, testing, final acceptance, and return of Phase One to Henry County Parks & Recreation for public use, the Contractor shall proceed with Phase Two consisting of the complete renovation of Fields 6 through 8, the Sunshine League therapeutic field, the concession building renovation, batting cage improvements, and all remaining site improvements. The Contractor shall coordinate all work with Henry County Parks & Recreation to maintain scheduled recreational programming and minimize disruptions throughout the duration of the project. The Work includes, but is not limited to, selective demolition; earthwork; laser grading; drainage improvements; complete replacement of irrigation systems; installation of certified 419 Bermuda sod; reconstruction of athletic infields utilizing new athletic infield mix and topdressing; renovation of the Sunshine League therapeutic field with a specialized ADA-accessible cushioned playing surface; construction of reinforced concrete sidewalks, accessible routes, equipment pads, retaining curbs, dugout roof systems, renovation of the existing concession facility, and miscellaneous site improvements. The project also includes installation of new 9-gauge galvanized chain link fencing, complete backstop systems with overhead safety netting, 30-foot black powder-coated backstop support poles, pedestrian and maintenance gates, 20-foot tall, minimum 3-inch diameter black powder-coated foul poles, premium black athletic backstop padding, custom black commercial-grade windscreens featuring the Henry County Parks & Recreation and City of McDonough logos, home run markers installed on the outfield fencing of all conventional fields, renovation of the existing 60-foot by 81-foot batting cage facility into a five-station training complex with synthetic turf and a sliding curtain divider system, demolition of the existing score tower slab, and restoration of all disturbed areas required for a complete turnkey installation. Question Deadline 10/28/2026 at 3:00 PM ET Deadline for requests for clarifications and questions electronically Question Response Deadline:November 4, 2026, 3:00pm

GC Bidding

$900,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
383
Active Projects
179
Bidding Soon
2,362
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2026

December 11, 2026

Project location map

125 S Zack Hinton Pkwy, McDonough, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed