Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 24, 2026

Demolition, site work and new construction of a water / sewer project in Ventura, California. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Specification No. WP27-14, which consists of the removal, disposal , and replacement of approximately 117 linear feet (LF) of reinforced concrete (RC) channel. It also includes the installation of 24 sections of 10' wide x 7' high x 4' long RC Precast Box with subdrain system , approximately 21 LF of cast in place RC channel transitions, the construction of approximately 227 square yards (SY) of 6-inch thick crushed miscellaneous base (CMB) access road, and the installation of 260 LF of chain link fence and gates as shown on the Plans. The Contractor shall perform all work necessary to complete the Contract in accordance with the Contract Documents. Unless otherwise specified, the Contractor shall furnish all materials, equipment, tools, labor, and incidentals necessary to complete the Work. All questions concerning the plans, specifications, requirements, terms, schedule, addenda, and any other matters related to the solicitations shall be submitted using the Bonfire web site using the "Opportunity Q&A tab. The estimated cost of construction is $ 1,058,235.00. COMPLETION TIME IS 225 WORKING DAYS

GC Bidding

$1,058,235.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
126
Bidding Soon
2,718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

January 4, 2027

Project location map

Maple St, Ventura, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed