Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 25, 2026

Site work and new construction of a road / highway in Bend, Oregon. Completed plans call for the construction of a road / highway.

Road and street improvements to improve safety, connectivity, and access in southeast Bend. Bonds: Other Bond required (unspecified amount). The Engineers estimate is $ 7,447,202. The Aune Safety and Connectivity Project include the following elements: o Aune Street (Division Street to Scott Street): Install new sewer and water lines and reconstruct the roadway. Construct a shared use path on the north side of Aune Street and a sidewalk on the south side. Coordinate with BNSF for work adjacent to and parallel with the railroad. o Scott Street and Aune Street Crossing: Construct a pedestrian median to provide a safer crossing at Scott Street and Aune Street. Coordination with Pacific Power for intersection lighting upgrades. o Scott Street/2nd Street: Construct a new shared use path along Scott Street, sidewalk infill at select locations, and traffic calming improvements along 2nd Street. Traffic calming improvements include adjustments to existing tubular markers, roadway narrowing, and a reduced posted speed limit. o 2nd Street and Miller Avenue: Construct a new marked crossing at 2nd Street and Miller Avenue. Coordinate with Pacific Power for intersection lighting upgrades. o 3rd Street and Burnside Avenue Intersection: Construct a median on 3rd Street extending north and south of Burnside Avenue, with marked crossings and Rectangular Rapid Flashing Beacons (RRFBs). Coordinate with Pacific Power for intersection lighting upgrades. o 3rd Street Shared Use Path: Upgrade the existing sidewalk on the west side of 3rd Street between Davis Avenue and Burnside Avenue to a shared use path. Coordinate with Pacific Power for installation of new meters serving pedestrianscale lighting along the shared use path. o Miller Avenue Shared Use Path: Construct a shared use path along Miller Avenue connecting the 3rd Street shared use path to 2nd Street. o 3rd Street and Miller Avenue Signalized Intersection: Install a new traffic signal at 3rd Street and Miller Avenue and modify the intersection to provide two northbound through lanes and two southbound through lanes, including construction of a tapered raised median on 3rd Street. Coordinate with Pacific Power for installation of a new meter serving the traffic signal.

GC Bidding

$7,447,202.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2026

January 11, 2027

Project location map

Multiple Locations, Bend, OR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed