Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 23, 2026 at 8:00 PM
Updated October 26, 2026
Demolition, site work and asbestos abatement for a municipal facility in Danville, Illinois. Completed plans call for the demolition of a municipal facility; for asbestos abatement for a municipal facility; and for site work for a municipal facility.
Demolition of the structures at 212-216 N Logan Street, including asbestos abatement, removal of debris, and site restoration. The apparent silence of the specifications as to any detail or apparent omission from it as to a detailed description concerning point shall be interpreted as meaning that only the best commercial material or practice shall prevail and that only items of the best materials or workmanship are to be used. - Complete removal of ALL structures above grade, including all foundation and footing elements. Basement and crawl space debris removal; basement floor slabs broken into pieces no larger than two square feet to allow drainage. - Removal of other foundation slabs, detached garages, driveways, private sidewalks, and stairs on the property. - Contractor is responsible for all tipping fees associated with demolition. - All basements, crawl spaces, and excavated areas shall be backfilled with clean fill. Backfill materials should be layered no more than twelve inches thick and mechanically compacted or water jetted. - A topsoil layer of at least four to six inches, with at least 100 pounds per acre seeded and covered with straw. Watering for 14 days after seeding is required. Erosion control measures are mandatory on disturbed hillsides or edges near sidewalks or streets. - Remove all overgrowth , dead trees, and fallen branches. These can be taken to our yard waste facility Monday through Thursday from 7:00 AM to 4:00 PM -no Fridays. No trash, metal, or concrete will be accepted at the yard waste facility. - Live trees blocking demolition must be trimmed or removed . All scattered debris must be cleaned up, leaving the property neat from alley to street, property line to property line. - Completion of demolition to all of the standards set forth in the City of Danville Ordinance 151.26. - The pavement on the north side of the building shall be clean cut down the entire length of the asphalt. - Watering and maintenance of the grass for the first 30 days is required Question Deadline 10/22/2026 at 5:00 PM CT All questions or RFIs pertaining to this request shall be submitted in writing via email to Dustin Brown at dbrown@cityofdanville.org
GC Bidding
$450,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2026
November 30, 2026
212 N Logan Ave, Danville, IL
Related To This Project
Danville, IL
Bid Date: Oct 29 2026
Danville, IL
Bid Date: Nov 06 2026
Danville, IL
Bid Date: Nov 06 2026
Danville, IL
Bid Date: Nov 03 2026
Danville, IL
--
Danville, IL
--
Danville, IL
Bid Date: Oct 06 2026
Danville, IL
Bid Date: Nov 03 2026
Danville, IL
Bid Date: Nov 18 2026
Danville, IL
Bid Date: Sep 23 2026
Danville, IL
Bid Date: Oct 06 2026
Danville, IL
Bid Date: Sep 14 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed