Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 23, 2026 at 8:00 PM

Updated October 26, 2026

Site work and new construction of an educational facility in Camarillo, California. Completed plans call for the construction of a educational facility.

To bid on this Project, the Bidder is required to possess an "B", California contractors' license, The Bidder's license must remain active and in good standing in California throughout the term of the Contract. Contractor must have current registration with the Department of Industrial Relations. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. The Bidder's registration must remain active throughout the term of the Contract. A bid bond by an admitted surety insurer on the form provided by the VCOE, cash, or a cashier's check or a certified check, drawn to the order of the Ventura County Office of Education, in the amount of ten percent ( 10%) of the total bid price, shall accompany the Bid Form and Proposal , as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the VCOE for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. VCOE reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the VCOE awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. estimated construction cost range of $ 14,500,000 - $ 16,500,000. CONSTRUCTION OF BUILDINGS A, B AND C WHICH INCLUDES A TOTAL OF 8 CLASSROOMS, SUPPORT SPACES, ASSOCIATED RESTROOMS, DRINKING FOUNTAINS, UPGRADES ALONG THE PATH OF TRAVEL, COVERED WALKWAYS LANDSCAPED COURTYARD, SHADE STRUCTURES, NEW OUTDOOR RECREATION AREA, STUDENT DROP-OFF, NEW PERIMETER FENCING, NEW MONUMENT SIGN, AND EXTENSION OF UTILITY LINES TO SERVICE THE NEW BUILDINGS. pn-A# 03-122398 Question Deadline 11/11/2026 All questions about the meaning or intent of the Contract Documents are to be directed via email to the VCOE to dfateh@vcoe.org. The Project consists of the construction of a new public school building including site demolition and site improvements.

GC Bidding

$16,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
170
Bidding Soon
3,196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2026

January 4, 2027

Project location map

550 Airport Way, Camarillo, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed