Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 13, 2026 at 7:00 PM

Updated November 17, 2026

Site work and new construction of an educational facility in Fullerton, California. Completed plans call for the construction of a 9,078-square-foot, two-story above grade educational facility.

Construction of a new elevator tower for Building 100 at Fullerton College. Project consists of construction of new 2-Story Elevator Tower, adjacent 85 square foot Elevator Machine Room and 218 square foot Golf Cart Storage for Building 100 at Fullerton College, Fullerton, CA, for North Orange County Community College District, Anaheim, California, as shown on Contract Documents prepared by Westberg+White, Inc., Architects. Work includes: 1 . Selective Site Demolition Work Consisting of: a . Demolition and removal of existing above and below grade site improvements to accommodate construction of new facilities, including, but not necessarily limited to: Concrete seat wall Retaining wall. Low wall 4) Concrete curb. 5) Selected trees. 6) Planter and planter wall . 7) Concrete Step. Building Demolition Work Consisting of removal of existing: Cart storage structure and cover. Bridge connecting Building 1100 to Building 100. New Construction Consisting of: Elevator Tower constructed of: Structural steel and cold-formed metal framing. 2) Concrete platform between Building 100, elevator tower. 3) Portland cement paster exterior, and stair. Lightweight concrete tile roof with gutters and downspouts. Adjacent elevator machine room Golf Cart Storage with electrically operated sectional door. Concrete and metal pan stair from 2nd floor 1) Including quarry tile treads and decorative metal railing Site Improvement Work Consisting of: a. Concrete paving and curbs. 1 ) Including concrete apron from golf cart storage. Bonds: 10% Bid Bond, Certified Check required. Q&A Deadline October 29, 2026 5:00 PM (PDT) Bidders must submit Pre-Bid inquiries or clarification requests through the online portal.

Post-Bid

$3,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
711
Active Projects
249
Bidding Soon
4,492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

January 4, 2027

Project location map

321 E Chapman Ave, Fullerton, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed