Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2026 at 7:00 PM

Updated November 20, 2026

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Flint, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

5.07 mi of road reconstruction, grading, drainage, watermain and storm sewer replacement, noise wall replacement, guardrail, concrete sidewalk, ramps, curb and gutter, traffic signals, signing, ITS, lighting, pavement markings, reconstruction of 8 structures, rehabilitation of 20 structures, 1 deck park conversion, removal of 8 structures, and approach work on I-475 from Thread Creek to Flint River in the cities of Flint and Burton, Genesee County. This project is an Alternate Pavement Bid Project. Alternate 1 (Section 2) is an Hot Mix Asphalt Alternative and includes a 5 year materials and workmanship pavement warranty. Alternate 2 (Section 3) is a Concrete Alternative and includes a 5 year materials and workmanship pavement warranty. This project also includes a 5 year epoxy overlay performance warranty, a 2 year bridge coating warranty, and a 2 year concrete surface coating warranty Federal Project Number 26A1191 Control Section RBMP 25132 RBMP 25132 Required SBP Participation: 5.00% Net Classification Required For This Project: ** 225052 Ea or 225052 Fa ** In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications Ea, Fa and either B or Cb. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 702 - Road Reconstruction, Grading, Drainage, Watermain and Storm Sewer Replacement

GC Bidding

$225,052,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
161
Bidding Soon
2,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2026

January 19, 2027

Project location map

Multiple Locations, Flint, MI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed