Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated November 2, 2026

Site work and renovation of a fitness / recreation center in Birmingham, Alabama. Completed plans call for the renovation of a 90,000-square-foot fitness / recreation center.

Roof replacement at the Campus Recreation Center. est. $2,200,000.00 - $2,700,000.00 The project includes the replacement of the low-slope roof areas totaling approximately 90,000 square feet at the UAB Campus Recreation Building. The scope of work includes replacement of the entire roof assembly down to the existing structural steel deck in some areas, and partial replacement involving removal of the existing modified bitumen membrane and perlite coverboard while salvaging the existing polyisocyanurate insulation in other areas. The new roof assembly is to consist of minimum LTTR-25 flat stock polyisocyanurate insulation, a new adhered high-density polyisocyanurate coverboard, and a fully adhered 80-mil PVC roof membrane. Replacement of the existing flashings and roof accessories (e.g., parapet flashings and coping, curb and penetration flashings, etc.) is also included. The project also includes several facade-related scopes, including repair and coating of exterior insulation finish system (EIFS) rising walls at the roof level, sealing and repair of existing sloped glazing/skylights, and isolated brick masonry facade repairs where masonry distress adjoins the roof areas. Several mechanical, electrical, and plumbing-related scopes of work are also included in the project. Existing mechanical units, ductwork, pipes, etc., are to be supported or raised as necessary to remove and install a new roof assembly in compliance with the project documents. Drainage improvements in the scope of work include replacement of existing cast-iron roof drain bodies, clamping rings, and strainers and attaching these to existing stormwater piping, as well as installation of new overflow drains, associated piping, and outlets. The scope of work also includes the careful disassembly, removal from the roof, and palletization on grade of existing roof-mounted solar panels and their mounting hardware. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

$2,700,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
54
Bidding Soon
953
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2026

January 18, 2027

Project location map

1513 University Blvd, Birmingham, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed