Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 11, 2026 at 7:00 PM
Updated November 17, 2026
Demolition, site work, new construction and renovation of a mixed-use development in Aurora, Colorado. Completed plans call for the renovation of a playground / park / athletic field; and 1,346-square-foot, one-story above grade playground / park / athletic field.
Question Deadline 11/10/2026 at 5:00 PM MT For any questions regarding the engineered structural plans, please contact Greg Rademacher at Martin/Martin Consulting Engineers, (303) 431-6100 ext. 587. Structural repair and reconstruction of the northeast corner of the pavilion following vehicle impact damage. Work includes demolition and reconstruction of CMU masonry walls, temporary shoring of roof framing, site restoration (curb, gutter, sidewalk, asphalt, landscaping), flooring paver replacement, interior finishes, ceiling repairs, camera reinstallation, and electrical/mechanical equipment repairs. The Spring Creek Park Pavilion Structural Repair project involves the repair and reconstruction of the damaged northeast corner of the pavilion and associated interior and site repairs, restoring the building to its pre-damage condition in accordance with 2024 IEBC Chapter 4 ( Less Than Substantial Damage). Scope includes: Temporary shoring of existing roof framing during repair work. Demolition of damaged concrete masonry unit (CMU) walls at the northeast corner. Reconstruction of masonry walls, including new steel reinforcing, lintels, anchor bolts, and post-installed dowels per structural details. o Repair of existing masonry units to remain, matching existing color, texture, and bond pattern. Foundation-level reinforcing dowel work per structural details. Replacement of damaged downspouts, gutters, fascia, and soffit as needed to complete the repair. Site restoration, including curb, gutter, and sidewalk repair at the two affected locations, asphalt crack repair in the parking lot, and restoration of the damaged landscape planting bed. Removal and replacement of damaged paver flooring within the pavilion, patched to match existing. Cleaning, staining, and finishing of the pavilion's wood ceiling and trim, including replacement of damaged boards to match existing. Removal, protection, and reinstallation of interior and exterior surveillance cameras as required for the work, with each reinstalled camera tested to confirm proper function. o Replacement of the damaged restroom steel door, hinges, and lockset, and repair of hairline masonry cracking in the restroom. . Repair of the front entrance ceiling, including replacement of the recessed light fixture, trim, and drywall, textured and painted to match existing. o Replacement and installation of the damaged pavilion trash receptacle to match existing. Evaluation of the 10' x 10' roll-up door and keyless entry pad, with repair as required to restore proper operation. Full replacement shall be priced as a separate alternate. Debris removal and final construction cleaning of the pavilion and affected areas. The scope of work is defined by the structural construction documents prepared by Martin/Martin Consulting Engineers (Project No. 26.1101.S.01 , dated 9/16/2026), attached to this invitation. The scope of work includes, but is not limited to, the following: 1. Permitting and Site Preparation: Work with the Owner, structural engineer, and Arapahoe County to ensure all permits and regulatory requirements are satisfied. Engage a Colorado-licensed Professional Engineer to design temporary shoring required to support existing roof framing during repair. Shoring shall remain in place until repairs are complete, fully cured, and have passed inspections. o Remove the existing emergency shoring and temporary framing installed following the incident, coordinated with installation of the engineered temporary shoring. o Appropriate site preparation and protection of surrounding park areas. 2. Demolition and Removal: Removal of damaged masonry, framing, and related building elements as specified. Proper disposal of all debris. 3. Construction: o Execution of structural repair and reconstruction as defined by the engineered structural drawings. o Coordination of masonry block, mortar color, and texture samples with the District for approval prior to procurement. o Coordination with the District's separately retained special inspection agency, as required for Level 2 special inspections under the structural drawings. The Contractor shall request and schedule all required inspections, and the cost of any additional testing or inspection resulting from corrective work shall be borne by the Contractor. . Preparation of all submittals required by the structural drawings, including product data (masonry block, reinforcing, and anchor bolts), mortar and grout mix designs, and reinforcing steel shop drawings per ACI 315. All submittals shall be in electronic format. o Construction of a masonry sample panel, minimum 4 feet by 4 feet, for acceptance prior to proceeding with masonry work. o Photo documentation of the existing below-grade masonry to remain, submitted to the structural engineer for evaluation prior to installing adhesive dowels. o Re-establishment of existing masonry control joints, including exterior sealant to match existing conditions, with the product submitted to the District for approval. o Field verification of existing structural conditions. The Contractor shall notify the structural engineer of any conditions that differ from the drawings and allow for their resolution in the construction schedule. o Protection and retention of existing top plates, wood framing, and connections. The Contractor shall notify the structural engineer of any damage. 4. Post-Construction: Final site clean-up and disposal of construction waste. Delivery of "as-built" plans and warranties Participation in the final inspection and punch list process, and coordination of Arapahoe County's final sign-off to lift the "unsafe to occupy" posting Bonds: 100% Performance Bond, 100% Payment Bond, 100% Other Bond.
GC Bidding
$2,000,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 30, 2026
January 29, 2027
4001 S Himalaya St, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Nov 06 2026
Aurora, CO
Bid Date: Nov 17 2026
Aurora, CO
Bid Date: Nov 18 2026
Aurora, CO
Bid Date: Nov 30 2026
Aurora, CO
Bid Date: Nov 13 2026
Aurora, CO
Bid Date: Nov 20 2026
Aurora, CO
Bid Date: Nov 20 2026
Aurora, CO
Bid Date: Nov 18 2026
Aurora, CO
Bid Date: Nov 12 2026
City of Aurora Public Safety Training Center (CAPSTC) Fire Water Recycle Pond Improvements - 6309194
Aurora, CO
Bid Date: Nov 02 2026
Aurora, CO
--
Aurora, CO
--
Aurora, CO
Bid Date: Nov 02 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed