Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2026 at 7:00 PM

Updated November 25, 2026

Demolition, site work, new construction and renovation of a mixed-use development in Farmington, New Mexico. Completed plans call for the construction of a water / sewer project; for the renovation of a playground / park / athletic field; and water / sewer project.

The City of Farmington, New Mexico ("Owner") is requesting Bids to furnish all labor, equipment and materials to replace the existing outlet structure, overflow standpipe, valves, and conduit at Civitan Park Pond (City Reservoir) as shown on project drawings with a new 5'x5' precast concrete outlet structure, installation of the outlet pipe through the embankment is being bid as two alternate options. Option A: Jack and Bore SDR 32.5 Snap-Tite Culvert Installation includes installation of 20" O.D. DR32.5 Snap-Tite HDPE conduit installed within a steel casing pipe with the 24" diam steel casing pipe (A53 Steel 0.375 wall thickness) installed by jackand-bore methods through embankment) or Option B: Open cut direct bury installation of 20" DIPS SDR21 HDPE outlet pipe. The base project includes open cut installation of the valves vault with knife valves; head gates; trash rack; and associated demolition, grouting, abandonment, erosion control, and site restoration for a complete replacement project. Bonds: Bid Bond required (unspecified amount). The Engineer's Opinion of Probable Construction Costs (OPCC) is $408,000. Question Deadline 11/10/2026 at 4:00 PM MT Questions and/or clarifications concerning this solicitation must be entered into the Questions tab in the online bidding system through the deadline date/time.

Post-Bid

$408,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
10
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2026

December 21, 2026

Project location map

2551 N Butler Ave, Farmington, NM

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed