Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 10, 2026 at 7:00 PM

Updated November 17, 2026

Renovation of a water / sewer project in Durango, Colorado. Completed plans call for the renovation of a water / sewer project.

Preservation of clarifier infrastructure at the Santa Rita Water Reclamation Facility (SRWRF). The project also references moving services for City Hall and the Police Department. The City of Durango invites interested and qualified individuals or firms capable of providing the required services to submit Bids. The City of Durango's Santa Rita Water Reclamation Facility (SRWRF) operates 4 secondary clarifiers, of which 2 need rehabilitated. The clarifiers were originally Hot Dipped Galvanized (HDG ) to protect the steel structure from rusting. The HDG has degraded in the majority of submerged steel , and rust has began forming. All submerged steel surfaces will need surface prepped and coated according to attached specs. Due to the location, full containment of the area is required, and special care must be taken not to damage the drive system of the clarifier. The awarded contractor will be required to coordinate with owner-hired third party NACE-certified coating inspector for quality control . Cleaning, surface preparation, and coating of all immersed components of Secondary Clarifiers # 3 & #4, which include but are not limited to: Center Pipe and Cage, Influent Well, Cylindrical Manifold , Unitube Header and supports, Truss Arm, Baffles, Surface Skimmer, Ramp & Scum Trough, Scum Baffle Full containment of work site Protection of Drive System If containment can be setup below the drive system to isolate the system from blasting materials and coatings, that may serve as necessary protection o Protection of suction holes on the Unitube header and pipe inlet on scum trough from all blast materials. Please provide a procedure to plug these items to keep them clean and free of debris during blast operations. o Scum Baffle, Bolts, Washers and Anchors: O Scum baffle and brackets are expected to be removed in order to be prepped and coated in their entirety. Any stainless steel hardware is expected to be reused . If contractor damages SS hardware, the contractor is expected to replace at their cost. SS hardware is to be left uncoated. Any carbon steel hardware found will need to be replaced with SS. Question Acceptance Deadline 10/29/2026 05:00 PM EDT

Post-Bid

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
10
Bidding Soon
156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2026

December 11, 2026

Project location map

Multiple Locations, Durango, CO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed